Fieldwork during the design phase of projects to verify existing conditions, determine new equipment locations, establish routing and elevations of piping and ductwork, confirm dimensions, and document piping tie-in locations. Materials handling systems (conveyance, hoppers/bins, dryers, dust collection, ductwork and spouting, etc.) design experience.