Experience in the design, installation, operation, or commissioning of the following equipment is highly desired: chillers, cooling towers, CRAC units, chilled water loops, mechanical plant sequence of operations, centrifugal pumps, piping design, piping design installation methods, air handling units and duct sizing. · Understands the key aspects of status quo data center mechanical systems to the extent that key sources of: high capital/operational costs, reduced efficiencies, high-levels of maintenance, security issues and safety risks can be identified as improvement areas in next-generation data center designs.