Complete new part quality documentation requirements; including, ballooned drawings, inspection check sheets, operator instructions, SPC (Statistical Process Control) charts, process flow diagrams, process failure mode and effects analysis’, process control plans, dimensional layout requirements, part submission warrants, capability study and measurement system analysis. Write direct computer controlled CMM (Coordinate Measuring Machine) programs utilizing PC-DMIS CMM software – this includes the CMM program that correlates to the ballooned drawing, set up photos and creation of set-up instructions, proving out the program and verification of its accuracy when discrepancies arise.