Civil Construction Scheduler with AIS Infrastructure

ASRC Industrial Services LLC

Chattanooga, TN

JOB DETAILS
SKILLS
Analysis Skills, Baseline Schedule, Calendar Management, Change Requests/Orders, Construction, Construction Management, Construction Planning, Construction Projects, Construction Schedule, Contract Requirements, Federal Contracts, Federal Government, Forecasting, Microsoft Excel, Microsoft Outlook, Microsoft Word, Multitasking, Naval Facilities Engineering Command (NAVFAC), Power Plant, Primavera, Progress Reports, Project Control, Project Engineering, Project Management Professional (PMP), Project Schedule, Project Tracking, Project/Program Coordination, Project/Program Management, Purchasing/Procurement, Schedule Development, State Government, Time Management, Variance Analysis
LOCATION
Chattanooga, TN
POSTED
17 days ago

Company Overview

The AIS Infrastructure Group consists of four heavy civil construction companies. Our services include infrastructure improvement, heavy civil construction, and site development for government and state agencies and private enterprise across the United States. We do a wide variety of heavy civil projects, including highways, bridges, and DOT work, power plants, dams and reservoirs, underground utilities, and more.

We are Heavy Civil Construction and Sitework experts, but we specialize in providing peace of mind.

AIS Infrastructure Group is part of a family of companies unified by purpose to deliver safe, reliable solutions to our clients' unique challenges. We are committed to providing superior service and leaving things better than we found them.

Job Summary:

The Scheduler for our Heavy Civil construction team across the country. The Scheduler is responsible for coordinating with the project management team to develop and maintain cost- and resource-loaded schedules for each project under contract. This includes developing strong baseline schedules, handling regular updates in Primavera P6, and managing all phases of the schedule-from initial setup and logic creation to progress updates and recovery planning. The Scheduler will collaborate with project managers, engineers, and field teams to ensure each schedule remains accurate, realistic, and aligned with contract requirements. The Scheduler shall also work with the Pre-Construction department to prepare initial project schedules for specific estimates prior to bid submission.

Develop, maintain, and update cost-loaded and resource-loaded schedules in Primavera P6 for all projects.

  • Build and maintain baseline schedules and oversee progress updates and recovery plans.
  • Review design, procurement, and construction inputs to establish realistic timelines and logic sequences.
  • Meet with project managers and production teams weekly to develop two-week look-ahead schedules and discuss progress, upcoming deadlines, and planned work.
  • Work with Pre-Construction to prepare schedules for major bids prior to bid due dates.
  • Conduct critical path and near-critical path analysis to identify potential delays and recommend recovery actions.
  • Track progress, analyze variances, and forecast schedule impacts.
  • Produce and distribute planning and scheduling deliverables, including progress reports, look-ahead schedules, and executive summaries.
  • Support time impact analyses for delays and change orders.
  • Review subcontractor schedules for logic, sequence, and accuracy.
  • Help standardize scheduling practices across multiple projects.
  • Communicate any milestone dates anticipated to be missed or impacts to the critical path to the Project Management Team and Director of Construction.
  • Perform all project control duties using the latest Primavera scheduling software.

Requirements and Education:

  • Minimum of 5 years of experience as a Scheduler for heavy civil construction projects.
  • Hands-on Primavera P6 experience in construction scheduling.
  • Ability to read and interpret drawings and specifications.
  • Strong understanding of CPM scheduling, logic ties, sequencing, cost, and resource loading.
  • Proficiency in Microsoft Excel, Word, and Outlook.
  • Good working knowledge of both building and civil construction planning.
  • Ability to learn and utilize new software and technology.

Preferred Requirements and Education:

  • PMI-SP, PMP, or AACE certification
  • Experience with Federal or State contracts (USACE, NAVFAC, DOT).
  • Experience scheduling Federal Government projects.
  • Bachelor's degree in Construction Management, Engineering, or a related field.

EEO Statement:

AIS Infrastructure Group is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, gender, color, age, sexual orientation, gender identification, national origin, religion, marital status, ancestry, citizenship, disability, protected veteran status, or any other factor prohibited by applicable law.

About the Company

A

ASRC Industrial Services LLC