Commissioning Engineer - Data Center Construction

Canadian Breaks Consulting LLC
  • Childress, TX
  • $115,000–$165,000 Per Year
  • Full-time
  • Instant Apply
18 days ago

Job Description

Commissioning Engineer – ConsultantAbout CBCCanadian Breaks Consulting, LLC is a growing consulting firm based in Amarillo, TX serving clients with customized project management solutions to complex problems on critical projects.Our Mission: "To plan, manage, and execute projects with hearts, hands, and feet of Christ."Our Core ValuesIntegrity: A commitment to Truth with a consistent and uncompromising adherence to strong moral and ethical principles and values.Excellence: A constant and consistent drive to uphold and raise standards in whatever you do.Prudence: A commitment to taking the extra step and considering the reasonableness of your actions as well as their consequences.Stewardship: An unwavering willingness to carefully and responsibly manage interests separate from and greater than your own.About the RoleIntroductionThe Commissioning Engineer supports onsite commissioning quality control by assisting contractors with startup preparation, executing checklists and functional testing, and closing the documentation that allows a system to be turned over. This position is fully onsite at the project in Childress, TX.Years of Experience3+ years of relevant experience in commissioning, startup, or field engineeringQualificationsRequired3+ years of commissioning, startup, or field engineering experience on industrial, high-tech, semiconductor, or mission-critical projects.Ability to read and interpret construction documents, specifications, control sequences, and technical manuals, and to verify installed work against them.Able to work fully onsite in Childress, TX, access all areas and levels of an active construction site, pass a pre-employment drug and alcohol screen, and work in the United States without sponsorship.PreferredThorough understanding of all aspects of commissioning, from pre-functional checklists through functional performance testing and turnover.Familiarity with medium- and low-voltage distribution, large generators, UPS equipment, and electrical installations on large mechanical and process equipment.Hands-on BMS, EPMS, or I&C verification and functional testing experience.Hands-on experience supporting integrated systems testing and load bank testing.Data center or other mission-critical MEP startup exposure.Experience with commissioning management software such as Latista or equivalent.OSHA 30 certification and current site-safety credentials.Highly developed visual observation and interpretation skills.Proficient in Windows and Microsoft Office 365 (Excel, Word, Outlook, Power Point and Teams), and have a strong understanding of working within a computer network.Experience with project management software such as Prolog, Procore, E-Builder, Bluebeam, Microsoft Project, and Primavera Project Planner (P6).Experience with design software such as AutoCAD, Revit and Navisworks.Training in design and construction document reading, design specifications, survey theory and techniques.Experience in organizing technical data in a neat and accurate method. Familiar with Construction Specifications Institutes (CSI) MasterFormat.Strong understanding of construction means and methods, sequencing, and field practices.Ability to work well and maintain a cooperative attitude in a fast-paced environment and manage multiple priorities.Excellent time-management skills and ability to multi-task and prioritize work while frequently interrupted by phone calls and questions on work in progress.Excellent written and oral communication skills with an ability to develop strong interpersonal relationships.Ability to work closely with variety of trade and craft people in a field work situation. Patience and professionalism are essential.Must be a strong team player with the ability to collaborate with various personnel within and across departments and at all levels of leadership.Work schedule must be flexible to allow extended hours or off-shift work to accommodate changing construction schedule and sequences.Key ResponsibilitiesPerform verification of MEP, electrical, and controls system installations and witness testing against drawings, specifications, and sequences of operation.Execute pre-functional checklists, startup verification, and functional performance testing, and support integrated systems testing and load bank testing.Assist contractors with startup preparation, including readiness checks, checklist execution, and documentation review.Ensure all systems are ready to operate safely and all safety precautions are in place before any system is operated.Interface between trade managers and multiple subcontractors to assist in coordinating mechanical, electrical, and controls startups.Maintain commissioning records, checklists, and status tracking logs in the project commissioning management system so documentation matches field conditions.Interpret construction documents and technical manuals required for verification and document control.Log, track, and close commissioning deficiencies, including verification of retest.Compile turnover documentation, including O&M manuals, training records, and warranty start dates. Pay and Benefits$115,000-$165,000Fully covered Employee+Fam BCBS PPO health insuranceFully covered Employee+Fam Dental & Vision Insurance2 weeks PTO

Job Posted by ApplicantPro

Numbers & Facts

LocationChildress, TX
Job TypeFull-time
Salary$115,000–$165,000 Per Year

Skills

  • AutoCADunmatched
  • Commission Controlsunmatched
  • Commissioningunmatched
  • Commissioning - Engineeringunmatched
  • Communication Skillsunmatched
  • Computer Networksunmatched
  • Constructionunmatched
  • Construction Document Setunmatched
  • Construction Scheduleunmatched
  • Consultingunmatched
  • Dental Insuranceunmatched
  • Design Documentunmatched
  • Document Controlunmatched
  • Documentationunmatched
  • Documentation Reviewunmatched
  • Electrical Componentsunmatched
  • Electricityunmatched
  • Engineeringunmatched
  • Establish Prioritiesunmatched
  • Functional Testingunmatched
  • Industrial Engineeringunmatched
  • Interpersonal Skillsunmatched
  • Leadershipunmatched
  • Load Testingunmatched
  • Low Voltage (LV)unmatched
  • Maintenance - Electricalunmatched
  • Mechanical, Electrical and Plumbing (MEP)unmatched
  • Microsoft Excelunmatched
  • Microsoft Officeunmatched
  • Microsoft Outlookunmatched
  • Microsoft PowerPointunmatched
  • Microsoft Projectunmatched
  • Microsoft Windows Operating Systemunmatched
  • Microsoft Wordunmatched
  • Multitaskingunmatched
  • Network Operations Centerunmatched
  • OSHAunmatched
  • Performance Testingunmatched
  • Preferred Provider Organization (PPO)unmatched
  • Presentation/Verbal Skillsunmatched
  • Primavera Project Plannerunmatched
  • Project Commissioningunmatched
  • Project Management Softwareunmatched
  • Project/Program Managementunmatched
  • Prolog Programming Languageunmatched
  • Quality Controlunmatched
  • Record Keepingunmatched
  • Requirements Managementunmatched
  • Sales/Support Engineering (SE)unmatched
  • Semiconductorsunmatched
  • Software Designunmatched
  • Startupunmatched
  • Stewardshipunmatched
  • System Integration (SI)unmatched
  • System Testunmatched
  • Systems Administration/Managementunmatched
  • Team Playerunmatched
  • Technical Writingunmatched
  • Test Dataunmatched
  • Testingunmatched
  • Time Managementunmatched
  • Vision Planunmatched
  • Writing Skillsunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Free resume builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Free resume builder