Connectivity Engineer, Leased - Data Center Construction

Meta

Albany, NY(remote)

JOB DETAILS
SKILLS
Artificial Intelligence (AI), Best Practices, Bill of Materials (BOM), Budget Management, Budgeting, Change Order Management, Change Requests/Orders, Communication Skills, Construction, Construction Engineering, Construction Management, Cross-Functional, DEC Computers, Design Document, Design Verification, Forecasting, Front-End Loading (FEL), Industry Standards, Intellectual Property (IP), Internet Service Providers, Leadership, Logistics, Management of Information Systems/Technology (MIS), Metrics, Network Cable, Network Operations Center, Product Design, Product Testing, Program Planning, Progress Reports, Project Close-Out, Project Control, Project Development, Project Lifecycle, Project Planning, Project Tracking, Project/Program Coordination, Project/Program Management, Purchasing/Procurement, Quality Assurance, Quality Control, Quality Metrics, Regulations, Request for Information (RFI), Retrofit, Risk Analysis, Safety/Work Safety, Standard Operating Procedures (SOP), Team Player, Technical Leadership, Technical/Engineering Design, Telecommunications, Testing, Time Management, Willing to Travel
LOCATION
Albany, NY
POSTED
Today

Summary:

Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our innovative services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta 's global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta 's server banks.The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally.

Required Skills:

Connectivity Engineer, Leased - Data Center Construction Responsibilities:

  1. Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta 's global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta 's server banks

  2. The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally

  3. Project Planning & Control - Create, maintain, and report on site project and program scope, schedules and milestones. Work closely with site project management team throughout the project lifecycle from the creation of project and program plans through project close out

  4. Learnings - Continually review ongoing projects for efficiencies in schedule, budget, and opportunities to enable cross-functional partners to be successful. Document data points to assist with field coordination of projects. Support development of project management best practices and initiatives, coordinating SOPs/SIPs with vendors, and participating in global and regional standards

  5. Forecasting - Support project controls team with forecasting and budget efforts as required. Share current project status with upstream and downstream partners, ensuring crisp and complete handoffs between teams

  6. Technical Reviews - Establish milestones for equipment purchase and track and report against these milestones Assist with the selection and review of a contractor to support the structured cabling work within a data center

  7. Metrics - Report progress and risks on site projects and other initiatives to key stakeholders

  8. Workflow - Work with installation partners to establish and track milestones. Conduct pre-project planning, project handoffs, and ensure design delivery and verification. Identify and respond to project risks and high-priority issues rapidly and effectively through effective action and appropriate escalation. Track and manage project change order requests

  9. Vendor Field Management - Responsible for all connectivity activities (OSP/ISP) within construction, projects on site including tracking and reporting actual progress related to schedule expectations. Set and communicate clear expectations together with the immediate site team, build key relationships with our installation partners and drive best practices, safe working environment and execute to a vision of 'right first time.'

  10. Quality Assurance - Perform physical inspections to ensure vendor work meets DEC quality standards throughout the lifecycle of the data center. Validate physical installs, test reports, build accuracy, material and local code compliance including constructability reviews on multiple design phases

  11. Technical Field Lead - Technical lead for industry and Meta standards, responsible to lead product evaluation, design, and installation methods in the field including scope clarification, design and installation details as the owner of the Request for Information process

  12. Technical Coordination - Develop solutions to in-field scope-gap or clash issues. Partner with DEC design and engineering teams to digitally support design reviews, BOM reviews, and as-built drawing validations

  13. Communications & Cross functional team engagement - Liaise with construction partners to ensure deliverables are met during new builds and retrofits. Coordinate with logistics partners, vendors, and suppliers to ensure a smooth end to end flow of materials as needed. Work closely with the relevant teams to proactively communicate progress and project risks and initiatives to key stakeholders

  14. Safety - Ensure that vendors adhere to safety obligations in accordance with local regulations and DEC Safety best practices. Lead a 'safety first' evironment, with open and transparent communication. Acknowledging appropriate EHS practices

  15. Travel - Position is remote and will require a minimum of 50% travel

Minimum Qualifications:

Minimum Qualifications:

  1. 5+ years experience in project management

  2. Experience engaging and guiding stakeholders

  3. Experience providing solutions to construction related problems

  4. Experience with Google Workspace

Preferred Qualifications:

Preferred Qualifications:

  1. Experience in leading deployments of Network/Structure cabling infrastructure

  2. Experience reviewing and leading installations to design documents and specifications

  3. Data center development and/or construction management experience

  4. Experience with fiber optic testing at scale, inclusive of complex troubleshooting

  5. Experience with Primavera 6

  6. Experience managing IT or IP Network deployment projects in a mission critical environment requiring coordination across multiple disciplines for the delivery of a common goal

  7. Experience with outside plant cabling (OSP) deployments including OTDR/OLTS testing

  8. Experience with Quality Assurance and Quality Control, including progressive inspections and acceptance

  9. Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements)

  10. Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews)

  11. Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies

Public Compensation:

$123,000/year to $176,000/year + bonus + equity + benefits

Industry: Internet

Equal Opportunity:

Meta is proud to be an Equal Employment Opportunity and Affirmative Action employer. We do not discriminate based upon race, religion, color, national origin, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender, gender identity, gender expression, transgender status, sexual stereotypes, age, status as a protected veteran, status as an individual with a disability, or other applicable legally protected characteristics. We also consider qualified applicants with criminal histories, consistent with applicable federal, state and local law. Meta participates in the E-Verify program in certain locations, as required by law. Please note that Meta may leverage artificial intelligence and machine learning technologies in connection with applications for employment.

Meta is committed to providing reasonable accommodations for candidates with disabilities in our recruiting process. If you need any assistance or accommodations due to a disability, please let us know at accommodations-ext@meta.com.

About the Company

M

Meta