General Work Scope Inclusions
1. Provide all supervision, labor, materials, tools, supplies, and equipment necessary to complete the work indicated herein and as directed by Graham site supervision. Note: most of this building is being utilized as a Laboratory and needs to be cleaned to those standards.
o Final Cleaning all rooms including, but not limited to:
Wiping down all walls, doors, base boards
Cleaning of all cabinetry
Cleaning all floors
o Interior and exterior glass surfaces and windowsills.
o In areas without ceilings (106, 111, 112. 113, 202, 203, 209, 227, 228, 229, 230, 231, 232) wipe down all ductwork, piping, lights, etc.
o Clean all restrooms. Including polishing of Stainless-steel partitions, cleaning mirrors, lockers, showers, etc.
o Power wash the exterior of the building, including sidewalks
o Final Cleaning shall be in accordance with Section 017700 of the Project Manual.
2. Daily cleanup of work and work area to dumpsters. Dumpsters provided by others.
Felons are encouraged to apply!
Powered by JazzHR
| Location | Fremont, NE |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Free resume builder