Construction Scheduling Manager | Power & Utilities (Scottsdale, AZ)

Quanta Infrastructure Solutions Group, LLC
  • Scottsdale, Arizona
  • Full-time
2 days ago

Job Description

About Us:

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.


Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role:

Scheduling Manager

In Office: 15990 N. Greenway-Hayden Loop, Scottsdale, Arizona 85260  

Up to 30% domestic travel 

 

If you’re a hands-on scheduling leader who understands what actually drives a project’s completion date — and you want the opportunity to build something bigger — we’d like to hear from you.

 

QISGis looking for an experienced EPC Planning & Scheduling Manager to lead planning and scheduling across complex, multi-project energy infrastructure programs.

This is more than a schedule-management role. You’ll lead a team of Scheduler/Planners while staying close to the work — shaping execution plans, driving critical path analysis, identifying schedule risk, and partnering with project leaders, clients and subcontractors to keep major projects moving.


You’ll have the opportunity to build and strengthen our scheduling function, establish best practices, develop talent and bring greater consistency to how we plan and execute EPC projects.


The ideal candidate brings 10+ years of EPC planning and scheduling experience, expert P6 skills, strong CPM/critical path expertise, and experience with cost- and resource-loaded schedules, EVM and schedule risk analysis. Utility, Power Generation or large-scale industrial EPC experience is preferred.

What You'll Do:
  • Lead, mentor, and develop a team of Scheduler/Planners supporting complex EPC projects
  • Build and grow the planning and scheduling team by establishing processes, standards, best practices, and career development opportunities
  • Provide leadership and oversight for integrated project planning, scheduling, forecasting, and reporting activities
  • Develop and maintain EPC master schedules that align engineering, procurement, construction, subcontractor activities, and client milestones
  • Partner directly with clients, subcontractors, project managers, and functional leaders to align execution plans and resolve schedule challenges
  • Own critical path analysis and communicate key schedule drivers, risks, constraints, and recovery strategies
  • Analyze schedule logic, relationships, lag/lead time, float, sequencing, and resource impacts to understand what is driving project completion dates
  • Challenge schedule assumptions and work with project teams to develop mitigation and recovery plans
  • Oversee CPM and LSM schedule development, including cost- and resource-loaded schedules
  • Lead schedule reviews, baseline development, progress updates, forecasting, and change management
  • Perform schedule risk analysis, critical path reviews, and time impact analysis (TIA)
  • Oversee Earned Value Management (EVM), KPIs, and integrated cost/schedule performance reporting
  • Establish scheduling standards and improve planning discipline across projects and teams
  • Support proposal, pursuit, and project startup planning efforts
What You'll Bring:
  • 10+ years of EPC construction planning and scheduling experience
  • Experience leading, mentoring, and developing Scheduler/Planner teams
  • Proven ability to build and improve scheduling processes and team capabilities
  • Expert-level Primavera P6 experience
  • Strong understanding of CPM scheduling, critical path methodology, and schedule analytics
  • Ability to identify schedule drivers and explain the impact of logic ties, lag/lead time, float, constraints, and sequencing decisions
  • Experience partnering with clients, subcontractors, and cross-functional project teams
  • Strong understanding of EPC execution across engineering, procurement, and construction
  • Experience with Earned Value Management (EVM), cost/schedule integration, and performance reporting
  • Strong leadership, communication, and stakeholder management skills
  • Utility, power generation, or large-scale industrial EPC experience preferred
What You'll Get:

QISG Benefits & Total Rewards Highlights

  • Competitive base compensation
  • Target annual performance-based bonus opportunity
  • Target Restricted Stock Unit (RSU) award opportunity for eligible roles
  • Comprehensive medical, dental, and vision coverage with 100% preventive care
  • Company-funded HSA and pre-tax savings options
  • 401(k) retirement plan with company contributions
  • Employer-paid short- and long-term disability, Life & AD&D insurance
  • Paid Time Off (PTO), 10 paid holidays, and paid parental leave
  • Education reimbursement and professional development opportunities
  • Employee Assistance Program (EAP) and voluntary benefit options
Equal Opportunity Employer:

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.

We are an Equal Opportunity Employer, including disability and protected veteran status.

We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Numbers & Facts

LocationScottsdale, Arizona
Job TypeFull-time

Skills

  • Analysis Skillsunmatched
  • Baseline Scheduleunmatched
  • Best Practicesunmatched
  • Calendar Managementunmatched
  • Change Managementunmatched
  • Communication Skillsunmatched
  • Construction Managementunmatched
  • Construction Planningunmatched
  • Construction Scheduleunmatched
  • Cross-Functionalunmatched
  • Detail Orientedunmatched
  • Earned Value Management (EVM)unmatched
  • Energy Performance Certificate (EPC)unmatched
  • Engineering Procurement and Construction (EPC/EPCC/EPCM)unmatched
  • Forecastingunmatched
  • Leadershipunmatched
  • Mentoringunmatched
  • Performance Analysisunmatched
  • Performance Metricsunmatched
  • Power Generationunmatched
  • Preventive Medicineunmatched
  • Primaveraunmatched
  • Process Capabilityunmatched
  • Process Developmentunmatched
  • Process Improvementunmatched
  • Project Planningunmatched
  • Project Scheduleunmatched
  • Project Start-Upunmatched
  • Project Trackingunmatched
  • Project/Program Managementunmatched
  • Purchasing/Procurementunmatched
  • Quality Assuranceunmatched
  • Quality Controlunmatched
  • Risk Analysisunmatched
  • Safety/Work Safetyunmatched
  • Schedule Developmentunmatched
  • Talent Managementunmatched
  • Team Lead/Managerunmatched
  • Team Playerunmatched
  • Technical/Engineering Designunmatched
  • Willing to Travelunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Free resume builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Free resume builder