Job Description
Electrical Code Compliance & QA Field Auditor
DataONE Construction — Vineland, NJ 08360 | Data Center Project
Tenure: 2+ years | Workweek: 70–80 hours | Pay: $20–$35/hr (DOE/skills) | Per Diem: $150/day if 90+ miles from site
Role Snapshot
- Own field audits and inspections for electrical installations.
- Use Procore on an iPad to capture photo evidence, generate reports, and maintain inspection logs.
- Confirm conformity with NEC, local codes, drawings, and project specifications.
- Coordinate with superintendents, foremen, and electricians to resolve issues immediately.
- Review submittals, shop drawings, and as-builts for accuracy; prepare the site for AHJ pre-inspections.
- Drive site-wide adherence to QA/QC and safety procedures.
Essential Functions
- Audit conduit routing, panel installations, terminations, labeling, and grounding/bonding systems.
- Document nonconformances; recommend and verify corrective actions through closure.
- Maintain meticulous QA/QC records to track trend data and demonstrate compliance.
- Conduct pre-inspections ahead of Authority Having Jurisdiction walkthroughs.
Required Skills & Credentials
- 3+ years of electrical QA/QC or related inspection experience (preferred).
- Strong command of NEC, field installation practices, and code compliance.
- Fluent in reading/understanding one-line diagrams, plans, and technical specifications.
- Procore proficiency is required for daily documentation and reporting.
- Exceptional attention to detail and field documentation discipline.
- Strong verbal and written communication; collaborative approach with field teams.
- Mandatory safety training: OSHA 10, NFPA 70E, LOTO, Fall Protection, Motorized Platform, Harassment.
- OSHA 10 or OSHA 30 preferred; NFPA 70E certification and Forklift license are pluses.
- Electrical License or NICET certification is advantageous but not required.
Technology/Tools: iPad; Procore (primary platform).
Compensation & Benefits
- Base Pay: $20–$35/hour depending on experience/skills; performance-based raise potential with annual manager reviews.
- Overtime: 1.5x for hours over 40.
- Saturday: 1.5x automatically.
- Sunday: 2x automatically.
- Holidays: 2x pay plus 8 hours of holiday pay (eligibility rules apply).
- Per Diem: $150/day for qualified travelers (90+ miles from jobsite).
- Benefits: Health, Vision, Dental after probationary period.
- PTO: Vacation, Sick, Bereavement, and Floating Holidays (post-probation).
- Paid Holidays: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day.
- Drive Time: Paid for travel from one jobsite to another during the workday.
Success Profile
- Quality-first mindset with urgency in the field.
- Organized, systems-driven documentation habits.
- Comfortable leading corrective action conversations with trades.
- Thrives in a fast-paced data center build environment.
Apply
If you’re ready to raise the bar on electrical quality and compliance in a mission-critical setting, we’d like to hear from you.
Numbers & Facts
| Location | Vineland, NJ |
| Salary | $20–$35 Per Hour |
Skills
Apple iPadunmatched
Auditingunmatched
Compensation and Benefitsunmatched
Constructionunmatched
Corrective Actionunmatched
Detail Orientedunmatched
Documentationunmatched
Electricityunmatched
Forklift Licenseunmatched
Microsoft FASTunmatched
National Electrical Codeunmatched
Network Operations Centerunmatched
OSHAunmatched
Presentation/Verbal Skillsunmatched
Problem Solving Skillsunmatched
Quality Assuranceunmatched
Quality Controlunmatched
Reporting Skillsunmatched
Safety Processunmatched
Safety Trainingunmatched
Team Playerunmatched
Writing Skillsunmatched
Level up your application
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Free resume builder