Electrical Coordinator / Field Engineer – Data Center Construction
Abernathy, TX (Lubbock Area)
Up to $57.69/hr DOE + Overtime + up to $150/day Per Diem
18-Month Contract
13 Days On / 1 Day Off
Join a High-Profile Mission Critical Data Center Project
We're seeking an experienced Electrical Coordinator to support one of the nation's fastest-growing hyperscale data center construction projects.
This role serves as the key liaison between engineering, procurement, construction management, commissioning, and field execution teams to ensure electrical systems are installed safely, efficiently, and on schedule.
If you've worked on Data Centers, Oil and Gas, Power Generation, Semiconductor, Manufacturing, or EPC projects, we'd like to speak with you.
Responsibilities
Qualifications
Experience with one or more of the following:
Preferred
| Location | 79311, TX |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Free resume builder