Want to know if you’re a fit? Upload your resume and let our AI show you.
Skills
Background Investigationunmatched
CPR Certificationunmatched
Code Redunmatched
Constructionunmatched
Construction Project Managementunmatched
Network Operations Centerunmatched
Safety Codesunmatched
Safety/Work Safetyunmatched
Description
Code Red Safety is looking for a field safety supervisor to oversee a construction project in Plain City, OH. Work is already in progress, and they are in need of additional field safety supervision to conduct field observations and to work with labor to maintain a safe environment. The project is expected to run for approximately 6 weeks, and they are currently working 7/10s.
Applicants MUST meet the following requirements:
Have at least 5 years of construction safety management experience
Have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CHST, or similar
Experience with air monitoring equipment, LOTO, confined space, fall protection and various types of lifts preferred
Have a current FA/CPR certification
Must be able to pass a drug test & background check
Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis. If you meet the qualifications above, please apply. If you are determined to be a good candidate for this position, we will be in touch to discuss additional details.