About Jerritt Canyon
The Jerritt Canyon deposit was discovered in 1972, and the first gold production from the property occurred in 1981. The Jerritt Canyon property contains 30,821 hectares of mining claims located in the mining-friendly state of Nevada. First Majestic acquired the Jerritt Canyon Gold Mine from Sprott Mining Inc. on April 30, 2021. In May 2023, operations were suspended to prioritize exploration and technical studies. Jerritt Canyon is now entering a new phase of evaluation and planning, requiring substantial technical support to advance the work necessary for a potential future restart of operations.
The Opportunity
The Geotechnical Engineer is responsible for evaluating soil, rock, effects of groundwater, and geologic conditions to ensure the safe and efficient design, construction, and operation of mining projects. This role supports open-pit mines, underground mines, tailings storage facilities, waste dumps, haul roads, and related infrastructure by assessing ground stability and geotechnical risks.
Geotechnical Engineers work closely with mine planning, geology, operations, environmental, and civil engineering teams to optimize mine safety, production, and long-term stability.
Responsibilities
The above duties and responsibilities are representative of the nature and level of work assigned and are not necessarily all-inclusive.
Education and Experience
Equal Employment Opportunity
The Company is an equal employment opportunity employer committed to providing employment opportunities to employees and applicants in accordance with all applicable laws.