Top Five Roles
Assists with the development of cartoon sets or rough outlines architectural deliverables at each phase of design in conjunction with ACI Bolands Collaborative Design Process. May author entire cartoon on smaller projects.
Acts with other staff based on project scale to research and design concepts and materials appropriate for the project its budget and the preferences and expectations of the client.
Acts as day to day contact for out of house consultant team during design phases
Active participant in producing documents alongside other team members
Supporting member of the construction administration team lead by the PM
Top Five Responsibilities
Ensure the entire design product is organized according to ACI Bolands standards and clearly delineates the materials and design intents developed with the Owner and design team.
Ensures the design deliverable maintains connection to the production schedule authored by the project manager and principal in charge. Acts as day to day connection between ACI Boland design team and any out of house consultant team on the project. Coordinates all communications and information exchanges between same.
Leads and coordinates response to directives and markups provided by the quality assurance and quality control reviewers promptly and completely.
Supports the PM during construction administration including responding to shop submittals in a timely fashion as requested and producing construction drawing directives as required by the work when assigned.