The LOTO Energy Marshal is the designated project authority responsible for administering, directing, and governing all hazardous energy control activities for the project. The Energy Marshal serves as the single point of authority for hazardous energy isolation, zero-energy verification, group lockout administration, temporary energization, and system restoration.
Program Administration
Administer the project Hazardous Energy Control Program.
Maintain ownership of project LOTO execution.
Ensure compliance with OSHA, NFPA 70E, client and project requirements.
Maintain current LOTO documentation and coordinate implementation across all contractors.
Planning
Develop, review, and approve Energy Isolation Plans, LOTO Permits, Switching Plans, Temporary Energization Plans, Commissioning Isolation Plans, Startup Isolation Plans, and Return-to-Service Plans.
Verify all hazardous energy sources are identified before authorizing work.
Hazard Identification
Identify electrical, mechanical, hydraulic, pneumatic, thermal, gravity, stored, chemical, process, remote-start, temporary power, and backfeed energy sources.
Isolation Management
Direct equipment shutdown, isolation sequencing, lock/tag installation, isolation boundaries, lock box setup, and documentation.
Approve changes to active isolation boundaries.
Zero Energy Verification
Perform or directly supervise official Zero Energy Verification.
Verify Live-Dead-Live testing, try-start verification, stored energy verification, and electrical, mechanical, battery, UPS, pressure, and valve isolation.
No work begins until verification is complete and documented.
Lock Box Administration
Administer group lock boxes, project isolation locks, key control, lock inventory, sign-on logs, and personal lock accountability.
Personnel Accountability
Ensure every worker attends the LOTO briefing, signs onto the permit, installs a personal lock, and removes their own lock.
Temporary Energization
Review and approve temporary energization and test release requests and ensure boundaries, PPE, communications, and re-verification are complete.
Commissioning & Contractor Coordination
Coordinate hazardous energy activities among construction, commissioning, startup, operations, utilities, owners, contractors, and vendors under one approved process.
Documentation
Maintain permits, Energy Isolation Plans, logs, verification forms, shift turnover records, audit records, training records, and incident documentation.
Return-to-Service
Authorize restoration only after confirming work completion, personnel accountability, documentation, approvals, and system readiness.
Audits & Training
Conduct routine audits, track corrective actions, verify qualifications, and provide refresher training when required.
Stop Work Authority
Suspend hazardous energy work whenever isolation integrity, verification, documentation, accountability, or safety is compromised.
Decision Authority
Approve or reject Energy Isolation Plans, permits, temporary energization, return-to-service, additional isolation requirements, and hazardous energy boundaries.
Key Performance Indicators
Zero unauthorized energizations.
100% permit compliance.
100% zero-energy verification before work.
100% personal lock accountability.
100% documented shift turnovers.
Zero uncontrolled lock removals.
100% audit completion and corrective action closure.
Numbers & Facts
Location
Odessa, Texas
Skills
Commissioningunmatched
Constructionunmatched
Corrective Actionunmatched
Documentationunmatched
Electricityunmatched
Energy Managementunmatched
Inventory Managementunmatched
Maintain Complianceunmatched
National Electrical Codeunmatched
OSHAunmatched
Performance Metricsunmatched
Presentation/Verbal Skillsunmatched
Project Controlunmatched
Project Executionunmatched
Startupunmatched
Testingunmatched
🎯
Be found by employers
5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.
Level up your application
Professional resume templates
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.