Mission-Critical HSE Coach (Data Center Construction)

Excel Inc.

Lithia Springs, GA

JOB DETAILS
SALARY
$50–$52 Per Hour
SKILLS
Accounting, Business Development, Career Counseling, Coaching, Construction, Construction Safety, English Language, Finance, ISO (International Organization for Standardization), Logistics, Multilingual, National Electrical Code, Network Operations Center, OSHA, Oil and Gas, Project Management Software, Regulations, Risk, Risk Analysis, Root Cause Analysis, Safety/Work Safety, Warehousing, Writing Skills
LOCATION
Lithia Springs, GA
POSTED
6 days ago

Shape safety on a live mission‑critical build in Lithia Springs, GA

Picture your Monday morning on a hyperscale data center site: permits are pulled, crews gather for a toolbox talk, and you—serving as the owner’s on-site safety representative—walk the job with a coaching mindset. You spot risks early, guide contractors toward safer methods, and turn regulations into practical, field-ready actions. That’s the heartbeat of this 12‑month assignment.

Contract snapshot

  • Engagement: 12‑month, on‑site, 1099 contract
  • Compensation:$50–$52/hour
  • Housing allowance:$500/week if you reside outside a 75‑mile radius
  • Schedule: Monday–Friday, on site, 8–10 hours/day
  • Start: Immediate
  • Location: Lithia Springs, GA (Mission‑Critical Construction)

Your day-to-day impact

  • Serve as the owner’s eyes and ears on site—personable, steady, and solutions‑oriented
  • Lead proactive coaching with GCs and subs—be a Safety Coach, not a Safety Cop
  • Oversee high‑risk activities (including high‑voltage work) and verify NFPA 70E practices
  • Facilitate and review JSAs, method statements, permits, and LOTO procedures
  • Conduct hazard risk assessments and post‑incident root cause analyses
  • Ensure conformance with ISO 45001 / OHSAS 18001 and local H&S regulations
  • Produce clear daily documentation and submit weekly timesheets using modern digital tools
  • Communicate crisply in writing and conversation with the Owner/Client and the Project GC

What you bring

  • Mission‑critical (data center) experience is required
  • 7+ years in data center environments; or10+ years in construction safety if no data center background/degree
  • Bachelor’s degree in health & safety preferred
  • High‑voltage exposure preferred; NFPA 70E familiarity expected
  • OSHA 500/510; BCSP CHST preferred
  • Fluency in the local language and proficiency in English
  • In‑depth knowledge of regional H&S standards and regulations
  • Competency with occupational H&S management systems (ISO 45001; OHSAS 18001)

About Excel Staffing

Excel Staffing partners with leading organizations across Oil & Gas, Petro‑Chemical, Construction, Data Centers, C‑Suite, HR, Project Management, Software/IT, Finance & Accounting, Hospitality & Events, and Warehouse & Logistics. Whether your needs are long‑term, short‑term, permanent, payroll, or project‑based, our rapidly expanding team is ready to deliver.

Ready to step in?

Contact: Stephen Torrez, Business Development Manager
www.excelstaffing.net

Stephen.Torrez@ExcelStaffing.net

About the Company

E

Excel Inc.