AST SpaceMobile is building the first and only global cellular broadband network in space to operate directly with standard, unmodified mobile devices based on our extensive IP and patent portfolio and designed for both commercial and government applications. Our engineers and space scientists are on a mission to eliminate the connectivity gaps faced by todays five billion mobile subscribers and finally bring broadband to the billions who remain unconnected.
Position Overview
The Multi-Layer Insulation (MLI) Installation Manager is responsible for leading the installation and quality execution of thermal insulation systems critical to spacecraft performance. This role oversees a team of technicians and ensures all MLI installations meet stringent thermal, cleanliness, and contamination control requirements.
The MLI Installation Manager partners closely with engineering, manufacturing, and program management to deliver high-quality hardware on schedule. This position plays a key role in bridging design intent with hands-on execution in a fast-paced aerospace production environment.
Key Responsibilities
Qualifications
Preferred Qualifications
Soft Skills
Technology Stack
Physical Requirements
This role is critical to ensuring the integrity and performance of spacecraft thermal systems, directly contributing to mission success through high-quality execution and team leadership.
This job description may not be inclusive to the duties and responsibilities listed. Additional tasks may be assigned to the employee from time to time or the scope of the job may change as needed by business demands.
AST SpaceMobile is an Equal Opportunity, at will Employer; employment is governed on the basis of merit, competence and qualifications and will not be influenced in any manner by race, color, religion, gender, national origin/ethnicity, veteran status, disability status, age, sexual orientation, gender identity, marital status, mental or physical disability or any other legally protected status.