Oracle Corp logo

Principal Data Center Construction Manager

Oracle Corp
  • Abilene, TX
  • $102,300–$209,500 Per Year
12 days ago

Job Description

Oracle Cloud Infrastructure (OCI)

Organization: OCI Hyperscale Data Center Infrastructure Delivery (DCID)

Role: Principal Data Center Construction Management (IC4)

Location: Shackelford County, Texas | Greater Abilene, Texas | Texas (DFW area) w/traveling up to 75%

Oracle Cloud Infrastructure (OCI) is seeking a Principal Data Center Construction Manager (IC4) to support field execution for a new hyperscale AI data center construction in Shackelford County, Texas. This role is responsible for supporting safe, predictable, and high-quality construction delivery across assigned buildings, systems, areas, or discipline scopes.

The Principal Data Center Construction Manager is a member of the OCI Data Center Infrastructure construction delivery team who supports daily construction activities by coordinating contractors, tracking field progress, helping resolve execution issues, reinforcing safety and quality expectations, and supporting turnover readiness for commissioning and startup.

This is a highly field-based role requiring strong site presence, direct contractor engagement, and hands-on execution support. The role helps ensure daily construction activities align with project sequencing, milestone commitments, and OCI delivery standards.

This position is based in Shackelford County, Texas, approximately 20 miles from the Oracle Cloud Infrastructure Abilene AI Data Center. We are seeking candidates who are local to the area or open to relocating to Abilene. Oracle offers relocation packages for eligible candidates.

We will consider candidates who are Texas Residents (local to the DFW area, preferred) and willing to travel over 75%.

Only Oracle brings together the data, infrastructure, applications, and expertise to power everything from industry innovations to life-saving care. And with AI embedded across our products and services, we help customers turn that promise into a better future for all. Discover your potential at a company leading the way in AI and cloud solutions that impact billions of lives.

True innovation starts when everyone is empowered to contribute. That's why we're committed to growing a workforce that promotes opportunities for all with competitive benefits that support our people with flexible medical, life insurance, and retirement options. We also encourage employees to give back to their communities through our volunteer programs.

We're committed to including people with disabilities at all stages of the employment process. If you require accessibility assistance or accommodation for a disability at any point, let us know by emailing accommodation-request_mb@oracle.com or by calling 1-888-404-2494 in the United States.

Oracle is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans' status, or any other characteristic protected by law. Oracle will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.

Disclaimer:

Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $102,300 to $209,500 per annum. May be eligible for bonus and equity.

Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle''s differing products, industries and lines of business.

Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following:

  1. Medical, dental, and vision insurance, including expert medical opinion

  2. Short term disability and long term disability

  3. Life insurance and AD&D

  4. Supplemental life insurance (Employee/Spouse/Child)

  5. Health care and dependent care Flexible Spending Accounts

  6. Pre-tax commuter and parking benefits

  7. 401(k) Savings and Investment Plan with company match

  8. Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.

  9. 11 paid holidays

  10. Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.

  11. Paid parental leave

  12. Adoption assistance

  13. Employee Stock Purchase Plan

  14. Financial planning and group legal

  15. Voluntary benefits including auto, homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.

Career Level - IC4

Responsibilities:

  • Support daily construction execution for assigned buildings, systems, areas, or trade scopes.
  • Work closely with general contractors, subcontractors, foremen, superintendents, and trade partners.
  • Monitor field progress, manpower, productivity, sequencing, and workface readiness.
  • Ensure construction activities align with approved schedules, milestones, logistics plans, and turnover priorities.
  • Identify and help resolve field issues, trade conflicts, congestion risks, and execution constraints.
  • Reinforce onsite safety expectations through visible field presence.
  • Support installation quality verification and help reduce rework.
  • Partner with QA/QC, commissioning, controls, logistics, safety, and operations teams.
  • Track punch-list items, turnover readiness, and startup support requirements.
  • Provide accurate daily field reports, progress updates, issue logs, and milestone updates.
  • Support recovery plans when schedule, quality, productivity, or coordination issues arise.
  • Support Construction Managers in promoting consistent field execution practices.
  • Maintain continuous site awareness through regular field walks and direct contractor engagement.
  • Evaluates reliability of materials, properties and techniques used in production; plans, designs and develops electronic parts, components, integrated circuitry, mechanical systems, equipment and packaging, optical systems and/or DSP systems.
  • Responsible for designing, developing, modifying and evaluating electronic, electro-mechanical or mechanical components, assemblies or integrated circuitry for hardware systems for the external market. Includes new design, as well as modification activities that results in significant product enhancement.
  • Activities encompass design, analysis, testing and process development using engineering principles and methods.
  • Technical disciplines may include electrical and logical design of printed circuit boards or integrated circuits; mechanical design of electronics enclosures or integrated circuit packaging; and embedded software/firmware design

Qualifications:

  • 5+ years of experience supporting construction execution on large-scale, complex projects.
  • Experience in data centers, mission-critical facilities, industrial construction, infrastructure, semiconductor, power, or other technical construction environments.
  • Knowledge of construction sequencing, field coordination, manpower tracking, productivity
  • monitoring, and milestone execution.
  • Ability to read and interpret construction drawings, specifications, schedules, look-ahead plans, and turnover documentation.
  • Proven ability to identify field risks, resolve construction issues, and escalate effectively.
  • Strong understanding of safety expectations, quality standards, punch-list management, and turnover readiness.
  • Excellent communication skills with the ability to provide clear, concise updates.
  • Ability to work primarily onsite with approximately 85-95% field/site engagement.
  • Strong ownership mindset, urgency, and the ability to operate in a fast-paced construction environment.

Preferred Qualifications:

  • Experience supporting hyperscale data center construction projects.
  • Experience in an owner's representative, construction management, EPC, or general contractor environment.
  • Familiarity with data center systems, including electrical, mechanical, controls, civil, structural, architectural, network, or commissioning-related scopes.
  • Experience supporting or coaching Construction Managers, field engineers, coordinators, or discipline-specific construction teams.
  • Experience supporting fast-track construction, phased turnover, commissioning-driven delivery, or recovery execution.
  • Familiarity with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes such as Primavera P6, Oracle Primavera Cloud, MS Project, Power BI, Tableau, Smartsheet, or similar tools.
  • Strong ability to drive contractor accountability while maintaining productive working relationships.
  • Ability to contribute through field presence, direct communication, disciplined follow-up, and practical problem solving.
  • Certifications such as PMP, PgMP, PMI-SP, CCP, PSP, or Lean Six Sigma.

#LI-LD1

Responsibilities:

  • Support daily construction execution for assigned buildings, systems, areas, or trade scopes.
  • Work closely with general contractors, subcontractors, foremen, superintendents, and trade partners.
  • Monitor field progress, manpower, productivity, sequencing, and workface readiness.
  • Ensure construction activities align with approved schedules, milestones, logistics plans, and turnover priorities.
  • Identify and help resolve field issues, trade conflicts, congestion risks, and execution constraints.
  • Reinforce onsite safety expectations through visible field presence.
  • Support installation quality verification and help reduce rework.
  • Partner with QA/QC, commissioning, controls, logistics, safety, and operations teams.
  • Track punch-list items, turnover readiness, and startup support requirements.
  • Provide accurate daily field reports, progress updates, issue logs, and milestone updates.
  • Support recovery plans when schedule, quality, productivity, or coordination issues arise.
  • Support Construction Managers in promoting consistent field execution practices.
  • Maintain continuous site awareness through regular field walks and direct contractor engagement.
  • Evaluates reliability of materials, properties and techniques used in production; plans, designs and develops electronic parts, components, integrated circuitry, mechanical systems, equipment and packaging, optical systems and/or DSP systems.
  • Responsible for designing, developing, modifying and evaluating electronic, electro-mechanical or mechanical components, assemblies or integrated circuitry for hardware systems for the external market. Includes new design, as well as modification activities that results in significant product enhancement.
  • Activities encompass design, analysis, testing and process development using engineering principles and methods.
  • Technical disciplines may include electrical and logical design of printed circuit boards or integrated circuits; mechanical design of electronics enclosures or integrated circuit packaging; and embedded software/firmware design

Qualifications:

  • 5+ years of experience supporting construction execution on large-scale, complex projects.
  • Experience in data centers, mission-critical facilities, industrial construction, infrastructure, semiconductor, power, or other technical construction environments.
  • Knowledge of construction sequencing, field coordination, manpower tracking, productivity
  • monitoring, and milestone execution.
  • Ability to read and interpret construction drawings, specifications, schedules, look-ahead plans, and turnover documentation.
  • Proven ability to identify field risks, resolve construction issues, and escalate effectively.
  • Strong understanding of safety expectations, quality standards, punch-list management, and turnover readiness.
  • Excellent communication skills with the ability to provide clear, concise updates.
  • Ability to work primarily onsite with approximately 85-95% field/site engagement.
  • Strong ownership mindset, urgency, and the ability to operate in a fast-paced construction environment.

Preferred Qualifications:

  • Experience supporting hyperscale data center construction projects.
  • Experience in an owner's representative, construction management, EPC, or general contractor environment.
  • Familiarity with data center systems, including electrical, mechanical, controls, civil, structural, architectural, network, or commissioning-related scopes.
  • Experience supporting or coaching Construction Managers, field engineers, coordinators, or discipline-specific construction teams.
  • Experience supporting fast-track construction, phased turnover, commissioning-driven delivery, or recovery execution.
  • Familiarity with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes such as Primavera P6, Oracle Primavera Cloud, MS Project, Power BI, Tableau, Smartsheet, or similar tools.
  • Strong ability to drive contractor accountability while maintaining productive working relationships.
  • Ability to contribute through field presence, direct communication, disciplined follow-up, and practical problem solving.
  • Certifications such as PMP, PgMP, PMI-SP, CCP, PSP, or Lean Six Sigma.

#LI-LD1

Numbers & Facts

LocationAbilene, TX
IndustryComputer/IT Services
Salary$102,300–$209,500 Per Year
Company Size10,000 employees or more
Year Founded1977

About Company

For over three decades, Oracle has been the center of innovation for business software birthplace of the first commercially available relational database, the first suite of internet-based applications, and the next-generation enterprise-computing platform, Oracle Fusion. Today, Oracle provides the world's most complete, open, and integrated business software and hardware systems, with more than 370,000 customers including - 100 of the Fortune 100 - representing a variety of sizes and industries in more than 145 countries around the globe. And Oracle's 110,000 global employees - including 30,000 developers working full-time on Oracle products -are critical to that success. Oracle Supports Workforce Diversity

Skills

  • Accidental Death and Dismemberment (AD&D)unmatched
  • Analysis Skillsunmatched
  • Artificial Intelligence (AI)unmatched
  • Calendar Managementunmatched
  • Cloud Computingunmatched
  • Coachingunmatched
  • Commission Controlsunmatched
  • Commissioningunmatched
  • Communication Skillsunmatched
  • Computer Firmwareunmatched
  • Constructionunmatched
  • Construction Drawingsunmatched
  • Construction Managementunmatched
  • Construction Projectsunmatched
  • Construction Supportunmatched
  • Control Systemsunmatched
  • Customer Relationsunmatched
  • DCID - Director of Central Intelligence Directiveunmatched
  • Dental Insuranceunmatched
  • Document Controlunmatched
  • Documentation Planunmatched
  • Electrical Designunmatched
  • Electricityunmatched
  • Electromechanicsunmatched
  • Electronic Designunmatched
  • Embedded Softwareunmatched
  • Embedded Systemsunmatched
  • Engineering Procurement and Construction (EPC/EPCC/EPCM)unmatched
  • Financial Planningunmatched
  • Flexible Spending Accountsunmatched
  • Healthcareunmatched
  • Infrastructure Constructionunmatched
  • Integrated Circuit Packagingunmatched
  • Integrated Circuits (ICs)unmatched
  • Lean Six Sigmaunmatched
  • Legalunmatched
  • Life Insuranceunmatched
  • Logisticsunmatched
  • Materials Analysisunmatched
  • Mechanical Assemblyunmatched
  • Mechanical Designunmatched
  • Microsoft Projectunmatched
  • Network Architecture/Engineeringunmatched
  • Network Operations Centerunmatched
  • Occupational Healthunmatched
  • Oracleunmatched
  • Organizational Skillsunmatched
  • Power BIunmatched
  • Primaveraunmatched
  • Printed Circuit Board Designunmatched
  • Problem Solving Skillsunmatched
  • Process Developmentunmatched
  • Progress Reportsunmatched
  • Project Management Professional (PMP)unmatched
  • Property Insuranceunmatched
  • QA Partner Testing Softwareunmatched
  • Quality Assurance Methodologyunmatched
  • Quality Controlunmatched
  • Quality Metricsunmatched
  • Risk Analysisunmatched
  • Safety/Work Safetyunmatched
  • Sales/Support Engineering (SE)unmatched
  • Semiconductorsunmatched
  • Software Designunmatched
  • Startupunmatched
  • Stock Purchase Plansunmatched
  • Tableauunmatched
  • Test Plan/Scheduleunmatched
  • Test Requirementsunmatched
  • Testingunmatched
  • Vision Planunmatched
  • Willing to Travelunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Free resume builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Free resume builder