JobID: 10022
Category: Operations/PreCon
JobSchedule: Full time
Posted Date: 2026-04-27T20:43:04+00:00
JobShift:
:
Job Summary
The Project Scheduler will provide technical assistance in creating and updating CPM schedules at all phases of each project throughout their duration, from conceptual to close-out. You will be Sundt Construction's in-house scheduling expert, including coordinating the CPM schedule creation and updating tasks directly with the project superintendent. The Project Scheduler produces and delivers various reports from the CPM schedule to the project team and may supervise one or more Project Scheduler assistants. The Project Scheduler I position includes 3-5 years CPM scheduling experience in similar types of construction.
Key Responsibilities:
Assists in the development of claims by providing analysis of project CPM schedule performance.
Assists the Project Superintendent with the incorporation into the CPM schedule the effects form design conflicts and clarifications.
Assists the project superintendent with the management of the CPM schedule for the successful execution of the work, including the coordination of the means and methods, manpower, equipment and material resources required to accomplish this goal.
Conducts project CPM schedule review meetings at each of proposal, baseline and update phases.
Creates the baseline schedule based on logic and sequence information provided by the project superintendent.
Develops proposal phase CPM schedules from project information provided by the estimating team and historical database.
Produce a final as-built CPM schedule at the completion of each project.
Provides reports each month to the general manager indicating the status of the CPM schedule for each project.
Regularly updates and maintains the historical CPM schedule database.
Revises each project CPM schedule on a weekly basis from reports completed by the project superintendent.
Minimum Job Requirements:
Excellent communication, organizational and supervisory skills are essential.
Five years or more of CPM scheduling experience in similar types of construction.
Four-year construction management or engineering degree or equivalent combinations of technical training and/or related experience.
Proficient use of all Microsoft Office Suite programs.
Thorough knowledge of all aspects of construction (technology, equipment, and methods), scheduling systems, negotiations, engineering and cost control schedules.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements:
Ability to wear personal protective equipment is required (including but not limited to; steel-toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.)
May reach above shoulder heights and below the waist on a frequent basis
May stoop, kneel, or bend, on an occasional basis
May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors
Must be able to comply with all safety standards and procedures
Occasionally will climb stairs, ladders, etc.
Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
Will interact with people frequently during a shift/workday
Will lift, push or pull objects on an occasional basis
Will sit, stand or walk short distances for up to the entire duration of a shift/workday.
#LI-RP1
| Location | Tempe, AZ |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Free resume builder