Code Red Safety is looking for a Safety Manager for a construction project in Midlothian, TX. Work is already in progress and they are looking to fill this role immediately.
Local candidates only as there is no per diem available.Applicants MUST meet the following requirements:- Have 5+ years of field safety experience.
- Must have at least one of the following: OSHA 30, OSHA 510, OSHA 500, CSST, CHST, CSHO or similar
- A Current BCSP Certification is preferred at this site
- Have a valid FA/CPR card.
- Must be able to pass a drug test & background check.
Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction projects nationwide on a
1099 independent contract basis. If you meet the above qualifications, please apply. If you are determined to be a good candidate for this position, we will be in touch to discuss additional details.