Contingent USTDA opportunity — South and Southeast Asia Aviation Infrastructure Project Scoping Mission (1131PL26R0063).
Role: Senior Airport Master Planning and Aviation Infrastructure Lead
Accountability: Lead airport system, master-plan, demand/capacity and phased-development analysis.
Required evidence: 15+ years airport planning/design; ICAO/FAA standards; feasibility and TOR development.
Preferred: Indonesia, Nepal, India or comparable emerging-market work.
This is contingent proposal recruiting and does not guarantee an assignment.
| Location | Washington (Remote) |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Free resume builder