Senior Electrical Engineer/Qualified Electrician - Data Center Construction

FST Technical Services

Ann Arbor, MI

JOB DETAILS
JOB TYPE
Full-time
SKILLS
Automation Systems, Budgeting, Commissioning, Commissioning - Engineering, Communication Skills, Construction, Construction Design, Construction Drawings, Construction Equipment, Contract Analysis, Customer Relations, Documentation, Electrical Engineering, Electricity, Engineer in Training (EIT), Expense Management, Fire Alarm, Fitness, Functional Testing, Home Automation, Information Models, LEED (Leadership in Energy and Environmental Design) Certified, Large-Scale Systems, Lift/Move 30 Pounds, Maintenance - Electrical, Meeting Minutes, Mentoring, Microsoft Office, Network Operations Center, OSHA, Performance Testing, Presentation/Verbal Skills, Problem Solving Skills, Pumps, Quality Assurance, Reporting Skills, Revenue Planning, Risk Management, Safety Training, Safety/Work Safety, Staff Training, Systems Administration/Management, Team Lead/Manager, Test Plan/Schedule, Time Management, Training Program, Willing to Travel, Writing Skills
LOCATION
Ann Arbor, MI
POSTED
30+ days ago
FST Technical Services’ Commissioning (Cx) Division is a leading provider of quality assurance in the design, construction, and post-acceptance phases of building projects. The Senior Electrical Commissioning Engineer reports to a team leader and is responsible for the delivery and execution of our commissioning services for complex electrical systems supporting large scale data center projects.

Primary activities include completing office assignments, time and expense management, in-field installation validation, field observation reports and meeting notes, functional performance testing, on-site and factory witness testing, writing of reports and meeting notes, submittal reviews, and design documentation evaluation.

Additional activities include executing target billable hours, managing tasks within time budgeted, leading Cx meetings, assisting the construction team with identifying/solving technical issues when they arise, and interpreting contract documents to predict scope gaps, maximize opportunities to provide value for clients, and reduce risk.

Administrative activities include supporting the team leader in coordinating weekly staff scheduling, training/mentoring team members on proper documentation, field procedures, and equipment usage, participating in and leading sessions of the company-wide developmental safety and training programs, and supporting revenue targets and quality assurance goals by expanding relationships with existing clients.

Candidate must be able to travel to and from various job sites within the assigned region.

Requirements:
  • Qualified Electrician or Degree in Electrical Engineering
  •  7+ years employment in a staff or intern position related to maintenance, construction, or engineering controls or 3+ years in the commissioning industry
  • Previous experience within the data center industry 
  • 5+ years of experience managing the interconnectivity of building equipment including pumps, fans, motors, air ventilation, chillers, boilers, steam distribution, heat absorption, building automation systems, optimization techniques, electrical distribution, fire alarm, variable refrigerant flow, and waste-water systems.
  • Knowledge of construction drawings, specifications, bid process, and ancillary industry documents
  • Aptitude to solve problems independently and in a team environment
  •  Effective verbal and written communication skills
  •  Public speaking and presentation skills
  •  Adaptability to varying indoor and outdoor working conditions
  •  Physical fitness, capability to lift at least 30 pounds, and ability to climb ladders
  •  Proficiency in Microsoft Office
Preferred Qualifications:
  • Trade association involvement
  • EIT, ACP. CEM or similar certification from experience
  • LEED or CEM certification preferred
  • OSHA 30 or other safe workplace certifications
  • Familiarity with building information modeling

FST Technical does not offer employment-based visa sponsorship for this position. Applicants must be legally authorized to work in the United States without the need for employer sponsorship now or in the future.

Salary Range:  $120,000-$170,000 - based on experience 

Powered by JazzHR

About the Company

F

FST Technical Services

FST Technical Services was founded in 1984 to serve the needs of the growing, worldwide Semiconductor/Microelectronics and Life Sciences industries. We began as an independent interface between our clients and their subcontractors to establish build clean installation methods that satisfied internal specifications and conformed to regulatory requirements.

FST’s core expertise is in developing technical and logistical solutions for complex needs by continually investing in the most advanced equipment and training to meet the needs of the rapidly changing markets it serves. Today, our business has expanded to additional markets, including Automation, Manufacturing, Data/IT Centers, Energy/Advanced Technology and Technology/Research Laboratories.

Our experienced FST team serves as your trusted partner for QA/QC Services, Equipment Services, Staffing Solutions, Project Management, Analytical Testing and Inspections – virtually anything you might need throughout your project lifecycle. FST professionals also provide project consultation and employee training. We guide our customers throughout each project phase to ensure full compliance.

With peerless performance and proven results, FST is with you all the way.

COMPANY SIZE
50 to 99 employees
INDUSTRY
Electronics, Components, and Semiconductor Mfg
FOUNDED
1984
WEBSITE
http://www.fsttechnical.com