FST Technical Services logo

Senior Electrical Engineer/Qualified Electrician - Data Center Construction

FST Technical Services
  • Ann Arbor, MI
  • $120,000–$170,000 Per Year
  • Autofill and Review
3 days ago
FST Technical Services

Job Description

FST Technical Services’ Commissioning (Cx) Division is a leading provider of quality assurance in the design, construction, and post-acceptance phases of building projects. The Senior Electrical Commissioning Engineer reports to a team leader and is responsible for the delivery and execution of our commissioning services for complex electrical systems supporting large scale data center projects.Primary activities include completing office assignments, time and expense management, in-field installation validation, field observation reports and meeting notes, functional performance testing, on-site and factory witness testing, writing of reports and meeting notes, submittal reviews, and design documentation evaluation.Additional activities include executing target billable hours, managing tasks within time budgeted, leading Cx meetings, assisting the construction team with identifying/solving technical issues when they arise, and interpreting contract documents to predict scope gaps, maximize opportunities to provide value for clients, and reduce risk.Administrative activities include supporting the team leader in coordinating weekly staff scheduling, training/mentoring team members on proper documentation, field procedures, and equipment usage, participating in and leading sessions of the company-wide developmental safety and training programs, and supporting revenue targets and quality assurance goals by expanding relationships with existing clients.Candidate must be able to travel to and from various job sites within the assigned region.Requirements:
  • Qualified Electrician or Degree in Electrical Engineering
  •  7+ years employment in a staff or intern position related to maintenance, construction, or engineering controls or 3+ years in the commissioning industry
  • Previous experience within the data center industry 
  • 5+ years of experience managing the interconnectivity of building equipment including pumps, fans, motors, air ventilation, chillers, boilers, steam distribution, heat absorption, building automation systems, optimization techniques, electrical distribution, fire alarm, variable refrigerant flow, and waste-water systems.
  • Knowledge of construction drawings, specifications, bid process, and ancillary industry documents
  • Aptitude to solve problems independently and in a team environment
  •  Effective verbal and written communication skills
  •  Public speaking and presentation skills
  •  Adaptability to varying indoor and outdoor working conditions
  •  Physical fitness, capability to lift at least 30 pounds, and ability to climb ladders
  •  Proficiency in Microsoft Office
Preferred Qualifications:
  • Trade association involvement
  • EIT, ACP. CEM or similar certification from experience
  • LEED or CEM certification preferred
  • OSHA 30 or other safe workplace certifications
  • Familiarity with building information modeling
FST Technical does not offer employment-based visa sponsorship for this position. Applicants must be legally authorized to work in the United States without the need for employer sponsorship now or in the future.Salary Range:  $120,000-$170,000 - based on experience 

Powered by JazzHR

Numbers & Facts

LocationAnn Arbor, MI
IndustryElectronics, Components, and Semiconductor Mfg
Salary$120,000–$170,000 Per Year
Company Size50 to 99 employees
Year Founded1984
Websitehttp://www.fsttechnical.com

About Company

FST Technical Services was founded in 1984 to serve the needs of the growing, worldwide Semiconductor/Microelectronics and Life Sciences industries. We began as an independent interface between our clients and their subcontractors to establish build clean installation methods that satisfied internal specifications and conformed to regulatory requirements.

FST’s core expertise is in developing technical and logistical solutions for complex needs by continually investing in the most advanced equipment and training to meet the needs of the rapidly changing markets it serves. Today, our business has expanded to additional markets, including Automation, Manufacturing, Data/IT Centers, Energy/Advanced Technology and Technology/Research Laboratories.

Our experienced FST team serves as your trusted partner for QA/QC Services, Equipment Services, Staffing Solutions, Project Management, Analytical Testing and Inspections – virtually anything you might need throughout your project lifecycle. FST professionals also provide project consultation and employee training. We guide our customers throughout each project phase to ensure full compliance.

With peerless performance and proven results, FST is with you all the way.

Skills

  • Automation Systemsunmatched
  • Budgetingunmatched
  • Commissioningunmatched
  • Commissioning - Engineeringunmatched
  • Communication Skillsunmatched
  • Constructionunmatched
  • Construction Drawingsunmatched
  • Construction Equipmentunmatched
  • Contract Analysisunmatched
  • Customer Relationsunmatched
  • Documentationunmatched
  • Electrical Engineeringunmatched
  • Electricityunmatched
  • Engineer in Training (EIT)unmatched
  • Expense Managementunmatched
  • Fire Alarmunmatched
  • Fitnessunmatched
  • Functional Testingunmatched
  • Home Automationunmatched
  • Information Modelsunmatched
  • LEED (Leadership in Energy and Environmental Design) Certifiedunmatched
  • Large-Scale Systemsunmatched
  • Lift/Move 30 Poundsunmatched
  • Maintenance - Electricalunmatched
  • Meeting Minutesunmatched
  • Mentoringunmatched
  • Microsoft Officeunmatched
  • Network Operations Centerunmatched
  • OSHAunmatched
  • Performance Testingunmatched
  • Presentation/Verbal Skillsunmatched
  • Problem Solving Skillsunmatched
  • Pumpsunmatched
  • Quality Assuranceunmatched
  • Reporting Skillsunmatched
  • Revenue Planningunmatched
  • Risk Managementunmatched
  • Safety Trainingunmatched
  • Safety/Work Safetyunmatched
  • Staff Trainingunmatched
  • Systems Administration/Managementunmatched
  • Team Lead/Managerunmatched
  • Test Plan/Scheduleunmatched
  • Time Managementunmatched
  • Training Programunmatched
  • Willing to Travelunmatched
  • Writing Skillsunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Free resume builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Free resume builder