TOOLMAKER 1

TekWissen LLC

Novi, MI

JOB DETAILS
SALARY
$27.85–$27.85
SKILLS
Automation, Bill of Materials (BOM), Blueprints, Diversity, Lathe, Machine Tool, Manufacturing, Mechanical Assembly, Metrics, Product Development, Sockets, Systems Administration/Management, Tool and Die Manufacturing, Workforce Management
LOCATION
Novi, MI
POSTED
4 days ago
Overview:
TekWissen is a global workforce management provider headquartered in Ann Arbor, Michigan that offers strategic talent solutions to our clients world-wide. The Client is an Italian multinational company based in Turin, Italy and is part of automaker Stellantis. The Client is an integrated company in the industrial automation field with an international network of 9 manufacturing plants, 6 facilities dedicated to the development of products and technologies, 5 establishments focused on digital skills and technologies, that span 13 countries and employ 4,000 people.
Job Title: TOOLMAKER 1
Work Location: Novi, MI 48375
Duration: 6 Months
Job Type: Temporary Assignment
Work Type: Onsite
Job Description:
Duties:
Individual is experienced performing the activities listed below on their own with little to no guidance or assistance from a Skill Trades Leader in a machine tool manufacturing environment. Should have basic knowledge to run a Lathe, Bridgeport and Surface Grinder.
Tool-maker Activities:
  • Able to determine assembly process from mechanical blueprints
  • Snap chalk lines and install floor plates
  • Install sealer equipment and camera stations
  • Install fence
  • Install upper cable tray
  • Install tooling
  • Install framing system
  • Install light screens and gate keys
  • Read mechanical blueprints and bill of material
  • Assembly units
  • Ability to drill, tap and ream holes
  • Able to use an optical level
  • Use of hand saw, drill press and grinders
  • Would cover these items during first few days OJT
  • Stencil and tagging frame
  • Check list completion
  • Torque audit Tool List
  • , 3/8", air ratchet or battery powered Impact
  • Small Ball Peen Hammer
  • Small Brass Hammer
  • 6, 10 & 12 Crescent Wrench
  • 12 combination Square
  • 2 Polisher
  • 3/8 Air Hand Drill or battery powered
  • 3/8 & Ratchets
  • 6 Calipers
  • 8 Torpedo Level
  • De-burring Tool
  • Drift Punches/Brass Punch
  • Metric Allen Wrenches
  • Metric Tape Measure
  • Metric Wrenches
  • Metric, 3/8, & Allen head sockets
  • Scribe
  • 6" scale
  • Tap Handle
  • Center Punch
  • Air Grinder
  • " Torque Wrench (Certified in house for use)
  • Feeler Gauges client reserves the right to deny any contractor assigned to work at any facility if the required tools listed above are not brought with them to work the job hired.
  • This will be at the cost of the contract house, not at the cost of client.
  • Required tools needed from incoming tool makers to all client sites
Skills:
  • Read prints
  • Has their own tools
  • Can make adjustments
  • example: cutting unistrut to fit. alter brackets. Operate a bridge port.
  • Can read a layout
TekWissen Group is an equal opportunity employer supporting workforce diversity.

About the Company

T

TekWissen LLC

WE THE TEKWISSEN PEOPLE

TekWissen offers you a broader portfolio of services, industry-leading solutions, and the meaningful innovations that give you greater flexibility and speed to respond to market dynamics, reduced costs and risk to improve enterprise performance, and increased productivity to enable growth.

To keep pace with global market demands, TekWissen keeps its finger on the pulse of change. Our organized approach to guiding a project from its inception to closure. Managing projects is becoming more and more important as we enter the digital era. To cope with the pace that this transition demands, a method is required to manage projects so they can yield quality work, while incorporating efficient use of time and resources.

Project involves identifying which quality standards are relevant to the project and determining how to satisfy them.

It is important to perform quality planning during the Planning Process and should be done alongside the other project planning processes because changes in the quality will likely require changes in the other planning processes, or the desired product quality may require a detailed risk analysis of an identified problem. It is important to remember that quality should be planned, designed, then built in, not added on after the fact.

Capabilities and accomplishments in one TekWissen business enhance the opportunity for success in the others. Put simply, TekWissen's unique combination of attributes promotes success.



COMPANY SIZE
100 to 499 employees
INDUSTRY
Computer/IT Services
FOUNDED
2009
WEBSITE
http://www.tekwissen.com/