Traveling Safety Regional Project Manager - Data Center Construction

Cbre Valuation
  • New Albany, OH
  • $145,000 Per Year
30+ days ago

Job Description

Aller au contenu

Développez votre carrière et votre potentiel chez CBRE

Menu

  • À propos de nous
  • Notre entreprise
  • Notre culture basée sur les valeurs
  • Joignez-vous à notre communauté
  • Recherche d'emploi
  • Connexion
  • Dansk
  • Deutsch
  • English - US
  • Español - ES
  • Español - MX
  • Français - Canada
  • Français - France
  • Italiano
  • Nederlands
  • Norsk Bokmål
  • Polski
  • Português - Brasil
  • Português - PT
  • Român
  • Slovenina, Slovenský Jazyk
  • Suomi, suomen kieli
  • Svenska
  • Ting Vit
  • Türkçe
  • etina, eský jazyk
  • -
  • -

Traveling Safety Regional Project Manager - Data Center Construction

Traveling Safety Regional Project Manager - Data Center Construction

Référence du poste

271897

Posté

20-avr-2026

Ligne de service

PJM Segment

Type de rôle

À plein temps

Centres d"intérêt

Data Centers, RSE

Localisation(s)

Abilene - Texas - United States of America, Atlanta - Georgia - United States of America, Columbus - Ohio - United States of America, Dallas - Texas - United States of America, Detroit - Michigan - United States of America, Indianapolis - Indiana - United States of America, La Grange - Georgia - United States of America, Lenoir - North Carolina - United States of America, Moncks Corner - South Carolina - United States of America, New Albany - Ohio - United States of America, Richmond - Virginia - United States of America

About the Role:

This 100% onsite role serves as the Owner's Safety Representative for Data Center (DC) construction. The primary responsibility is ensuring complete conformance to the Client's EHS policies and local DC construction management site requirements. The role provides guidance, coaching, advising, and technical support to the site construction management team including partnerships with General Contractor management and field worker supervision. Typical site construction hours (M-F 6:30a-5:30p)

Work assignment locations may include but not limited to GA, SC, GA, IN, NC, VA, TN, OH, MI and TX. This person must have the ability to travel to multiple project locations on both short and long term assignments as needed.

What You"ll Do:

  • Ensure adherence to Client EHS requirements, project Scope of Work (SOW), Contractor Safety Plans, and regulatory requirements through site safety walks and focused field audits.
  • Advise contractors on corrective actions and engage project management to address non-compliance or non-conformance situations.
  • Manage overall project EHS implementation, including the review and verification of EHS-related documents (CEHSP, Emergency Management Plan, RAMS, Safety Procedures). Evaluate the effectiveness of contractor hazard assessments (RAMS, JHAs, PTPs, etc.). Investigate, immediately report, and recommend preventative measures for all incidents, Near Misses, and occupational illnesses. Support the global construction EHS team on program development and execution.
  • Communications, Data Reporting, and Verification: Deliver accurate and timely EHS performance data and critical EHS metrics (Leading/Lagging KPIs, incident data, trends) to DC construction management.
  • Create, validate, and communicate lessons learned to the DC construction team and partners.
  • Participate in all essential meetings (e.g., GC all hands, Safety Committee).
  • Verify worker qualifications for compliance with training and procedural requirements via document verification and personal checks during field audits.
  • Ability to travel to multiple project locations on both short and long term assignments as needed.

What You'll Need:

  • Bachelor"s Degree preferred with 3-5 years of relevant experience working on data center/mission-critical construction projects. In lieu of a degree, a combination of experience and education will be considered.
  • Preferred experience, minimum of 8-10 years on complex, large-scale construction sites with 500+ workers.
  • In-depth knowledge of regulatory bodies, safety standards, rules, codes, and best practices for workplace safety and fire prevention, particularly concerning large-scale electrical, mechanical, trenching, and heavy equipment.
  • Experience in the areas of staffing, selection, training, development, coaching, mentoring, measuring, appraising, and rewarding performance and retention preferred.
  • Must be a safety-minded professional capable of acting as an owner's representative.
  • Ability to guide the exchange of sensitive, complicated, and difficult information. Convey performance expectations and handle problems.
  • Leadership skills to motivate team impact on quality, efficiency, and effectiveness of the job discipline and department.
  • In-depth knowledge of Microsoft Office products. Examples include Word, Excel, Outlook, etc.
  • Extensive organizational skills with a strong inquisitive mindset.
  • Advanced math skills. Ability to calculate difficult figures such as percentages, fractions, and other financial-related calculations.

Disclaimer:

Please be advised that effective January 1, 2025, CBRE Project Management and Turner & Townsend have been consolidated into a single global business entity. As a candidate applying for a position, you should be aware that while your initial employment may be with CBRE Project Management, you will subsequently transfer to the newly formed entity that encompasses both organizations.

Turner & Townsend carefully considers multiple factors to determine compensation, including a candidate's education, training, and experience. The minimum salary for this position is $145,000 annually and the maximum salary for this position is $175,000 annually. The compensation that is offered to a successful candidate will depend on the candidate's skills, qualifications, and experience. Successful candidates will also be eligible for a discretionary bonus based on Turner & Townsend's applicable benefit program. This role will provide the following benefits: 401(K), Dental insurance, Health insurance, Life insurance, and Vision insurance.

Postuler

Partager cet emploi :

Partager

  • Partager Traveling Safety Regional Project Manager - Data Center Construction avec LinkedIn
  • Partager Traveling Safety Regional Project Manager - Data Center Construction avec Twitter
  • Partager Traveling Safety Regional Project Manager - Data Center Construction avec un ami par courriel

Retour

Joignez-vous à notre communauté de talents

Keep up to date with exciting career

opportunities and the latest news.

S"inscrire

CBRE

  • À propos de CBRE
  • Responsabilité de l'entreprise
  • Carrières
  • Newsroom
  • Relations avec les investisseurs
  • Nous contacter
  • Politique de confidentialité
  • Conditions d'utilisation
  • Plan du site
  • Cookies settings Cookies settings

Copyright 2026 CBRE. All rights reserved.

Numbers & Facts

LocationNew Albany, OH

Skills

  • Address Managementunmatched
  • Best Practicesunmatched
  • Coachingunmatched
  • Constructionunmatched
  • Construction Managementunmatched
  • Construction Projectsunmatched
  • Construction Supportunmatched
  • Cookiesunmatched
  • Corrective Actionunmatched
  • Electricityunmatched
  • Emergency Managementunmatched
  • Emergency Planningunmatched
  • English Languageunmatched
  • Fire Preventionunmatched
  • Heavy Equipment/Vehiclesunmatched
  • International Businessunmatched
  • Leadershipunmatched
  • LinkedInunmatched
  • Maintain Complianceunmatched
  • Mathematicsunmatched
  • Mentoringunmatched
  • Metricsunmatched
  • Microsoft Excelunmatched
  • Microsoft Officeunmatched
  • Microsoft Outlookunmatched
  • Microsoft Product Familyunmatched
  • Microsoft Wordunmatched
  • Network Operations Centerunmatched
  • Newsroomunmatched
  • Organizational Skillsunmatched
  • People Managementunmatched
  • Performance Metricsunmatched
  • Project/Program Managementunmatched
  • Regulationsunmatched
  • Regulatory Requirementsunmatched
  • Safety Processunmatched
  • Safety Standardsunmatched
  • Safety Trainingunmatched
  • Safety/Work Safetyunmatched
  • Statement of Work (SOW)unmatched
  • Technical Supportunmatched
  • Time Managementunmatched
  • Twitterunmatched
  • Willing to Travelunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Free resume builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Free resume builder