About Jerritt Canyon
The Jerritt Canyon deposit was discovered in 1972, and the first gold production from the property occurred in 1981. The Jerritt Canyon property contains 30,821 hectares of mining claims located in the mining-friendly state of Nevada. First Majestic acquired the Jerritt Canyon Gold Mine from Sprott Mining Inc. on April 30, 2021. In May 2023, operations were suspended to prioritize exploration and technical studies. Jerritt Canyon is now entering a new phase of evaluation and planning, requiring substantial technical support to advance the work necessary for a potential future restart of operations.
The Opportunity
The Underground Fixed Maintenance Planner is responsible for planning, scheduling, and coordinating maintenance activities for underground fixed plant and infrastructure to ensure safe, reliable, and cost-effective operations. Working closely with Maintenance Supervisors, Reliability Engineers, Operations, and Supply Chain, the planner develops detailed work plans, ensures labor and materials are available, and drives maintenance best practices to maximize equipment availability and minimize downtime.
Responsibilities
The above duties and responsibilities represent the nature and level of work assigned and are not necessarily all-inclusive.
Education and Experience
Equal Employment Opportunity
The Company is an equal employment opportunity employer committed to providing employment opportunities to employees and applicants in accordance with all applicable laws.
| Location | Elko, NV |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Free resume builder