VDC Engineer - Data Center Construction

The Sundt Companies
  • Haskell, TX
    8 days ago

    Job Description

    JobID: 10978

    Category: Virtual Construction

    JobSchedule: Full time

    Posted Date: 2026-08-20T19:17:35+00:00

    JobShift:

    :

    Job Summary

    This position is the technical source of modeling information for various projects. The person that fills this role will need to have a thorough knowledge of construction documents, specification, and shop drawings.

    Candidate will create 3D/4D/5D models of any given project.

    Key Responsibilities

    1. Creates 3D models of Architectural, Structural and MEP systems.

    2. Maintains model libraries using correct uniformat or masterformat codes.

    3. Participates in activities to support the company's strategic planning efforts.

    4. Performs all primary job responsibilities of Virtual Construction Technician.

    5. Reviews bid scope documents for appropriate BIM language based on project delivery type and BIM deliverables.

    6. Trains virtual construction technicians in use of company approved software.

    7. Virtually walks through the model, identifying elements that are out of place.

    Minimum Job Requirements

    1. 3+ years blue print/specification reading.

    2. 3+ years in Autocad/Revit/Navisworks/CPM scheduling software.

    3. 4 year degree in Construction Management, Engineering or Architecture.

    4. 4+ years' construction experience.

    5. Proficient use of all Microsoft Office Suite programs.

    Note: Job Description is subject to change at any time and may include other duties as assigned.

    Physical Requirements

    1. May stoop, kneel, or bend, on an occasional basis

    2. Must be able to comply with all safety standards and procedures

    3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis

    4. Will interact with people and technology frequently during a shift/work day

    5. Will lift, push or pull objects pounds on an occasional basis

    6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.

    7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

    Safety Level

    Non-Safety Sensitive

    Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as

    operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

    Numbers & Facts

    LocationHaskell, TX

    Skills

    • 3D Modelingunmatched
    • Architectural Servicesunmatched
    • Blueprintsunmatched
    • Business Strategyunmatched
    • Computer Systemsunmatched
    • Constructionunmatched
    • Construction Document Setunmatched
    • Construction Managementunmatched
    • Email Technologyunmatched
    • Hazardous Materials/Substancesunmatched
    • Information Modelsunmatched
    • Machine Toolunmatched
    • Material Movingunmatched
    • Microsoft Officeunmatched
    • Network Operations Centerunmatched
    • Safety Complianceunmatched
    • Safety Processunmatched
    • Safety Standardsunmatched
    • Safety/Work Safetyunmatched
    • Strategic Planningunmatched
    • Telephone Skillsunmatched

    Be found by employers

    5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

    Level up your application

    Professional resume templates

    Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

    Free resume templates

    Free resume builder

    Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

    Free resume builder