Details
Posted: 13-Jul-26
Location: Merced, California
Type: Full Time
Salary: $131,000 to $188,000
Categories:
Civil - Environmental
Civil Engineering
Years of Experience:
5 - 10
Preferred Education:
4 Year Degree
Position Overview
Under general direction from the Manager of Engineering, Water Resources, the Water Resources Engineer performs professional-level engineering work across all aspects of the Water Resources Engineering Department. This includes staff supervision, planning, surveying, capital project management, project design, construction monitoring, encroachments, right-of-way management, water quality programs, and hydrography functions. The role supports continued development of departmental data management systems and collaborates with other departments (e.g., operations, maintenance, hydro, and parks) as needed to ensure reliable, efficient, and compliant water resource operations.
Key Responsibilities
Engineering Studies & Project Management
Water Quality & Data Systems
Stakeholder Coordination & Compliance
Representation & Additional Duties
Qualifications
Education
Experience
Skills and Abilities
Knowledge
Special Requirements
Work Environment
This is a fully on-site position based at the District's primary office location. Remote work or hybrid arrangements are not permitted; regular attendance at the designated worksite is an essential function of the role. The position is primarily office-based, with occasional fieldwork, travel for meetings/conferences/site visits, or exposure to outdoor conditions (50% or less of work time). Irregular or extended hours, including overtime and on-call emergency response duties, may be required.
Physical Demands:
Sitting and operating computer/office equipment for up to 8 hours per day.
Lifting/carrying up to 50 pounds; occasional stooping, kneeling, crouching, crawling, climbing, and negotiating stairways/uneven terrain.
Communicating effectively in person, by phone, radio, and in writing.
Hearing and vision sufficient for reading, operating equipment, receiving communications, and driving.
Environmental Factors:
Primarily office-based with occasional outdoor exposure to sun, dust, dirt, and temperature variations (50% or less).
May require irregular or extended hours, including overtime.
Mental Demands:
Exercise independent judgment and objective reasoning.
Organize, prioritize, and plan daily/weekly work activities.
Interpret complex regulations and document work accurately and concisely.
Manage multiple duties that may be interrupted or changed by immediate circumstances.
Supervision
Note: This job description outlines typical responsibilities and qualifications but is not exhaustive. Duties may evolve to meet District needs.
Create a Job Match for Similar Jobs
About Merced Irrigation District
Water, Power and More Merced Irrigation District owns, operates and maintains the New Exchequer and McSwain dams, reservoirs, and hydroelectric facilities. These are MID's primary water storage facilities on the Merced River. They are located in the foothills on the western slope of the Sierra Nevada mountain range, approximately 23 miles northeast of Merced. The two dams and reservoirs are integral parts of the 1964 Merced River Development Project and are licensed by the Federal Energy Regulatory Commission (FERC). Lake McClure (New Exchequer Reservoir) has a storage capacity of about 1,025,000 acre feet, while Lake McSwain (McSwain Reservoir) has a storage capacity of 9,730 acre feet. The New Exchequer Dam project was completed in 1967 as a multi-purpose effort: Lake McClure provides irrigation and domestic water supply, flood control, hydroelectric power generation, recreation and support for environmental stewardship. MID produces up to 107 megawatts of emission-free electricity at its Exchequer, McSwain and Merced Falls hydroelectric facilities. The district's water system diverts water from the Merced River at two locations below Lake McClure. The Northside Canal dive...rsion serves acreage north of the river. The Main Canal diversion is located 3 miles downstream of McSwain Dam and serves acreage south of the Merced River. MID's boundaries encompass 164,000 gross acres. Of that, 132,000 acres are irrigable. Of that, approximately 100,000 acres receive water from MID. The total distribution system of MID spans 862 miles. It is comprised of natural waterways, unlined and lined canals, sloughs and pipelines. MID also maintains 215 wells in support of its conjunctive management activities for groundwater and surface water. MID's irrigation distribution system supports local flood control by routing foothill-stream runoff away from populated areas. MID formed the Merced Irrigation District Drainage Improvement District #1 (MIDDID#1) in 1994. Several residential, commercial, industrial, and government parcels received drainage service from the district. MID owns, operates and maintains five recreation areas adjacent to lakes Mc lure and McSwain. While the Lake McSwain Recreation Area is located adjacent to Lake McSwain, McClure Point, Barrett Cove, Horseshoe Bend and Bagby Recreation Areas are all located adjacent to Lake McClure. A total of six boat launch facilities are available in the Parks system. More than 600 campsites are available year-round. Floating marinas are located on Lake McSwain and in two locations on Lake McClure. Recreational activities enjoyed in the recreation areas include fishing, boating, swimming, camping, hiking and bicycling. MID is authorized to act as an electric utility under the California Water Code. The district has owned and operated hydroelectric generating facilities on the Merced River since 1927. In 1996, MID exercised its authority to sell power to retail electric customers. Since then, MID has connected more than 12,600 customers to the electric system.
Show more
Show less
Connections working at Merced Irrigation District
https://careers.awra.org/jobs/22422751/water-resources-engineer-civil
Return to Search Results