Participating in pre-mortem and preconstruction meetings such as tower crane assembly and disassembly, tilt up operations, precast erection, zero lot line projects, shoring, excavations 15'' or greater, deeper utilities, masonry, high risk scaffolding, ROW operations, blasting, steel erection, SWPPP, Panelized systems, high risk jobsites, power energization, demolition, roofing, and setting rooftop equipment. Working Conditions: The Safety Manager's work is primarily performed indoors out of a main office or field office at theconstruction site; occasionally outdoors in various weather conditions with some exposure to healthor safety hazards, including noise level may range from moderate to loud.