NewHeavy Equipment Operator TesseraHeavy Equipment OperatorRichmond, VirginiaOperates various heavy and light equipment in maintenance projects such as preparing/paving/patching streets and parking lots,maintain gravel and other earth surfaced roads and access roads, blading road and ditches, removing and/or installing culverts, clearing weeds etc. This includes but not limited to trucks and trailers, backhoes, boom mowers, vacuum trucks, off road forklifts, bucket trucks, graders, front end loaders and tractors.
Engineer, Aircraft Power Plant Engineering STS Engineering SolutionsEngineer, Aircraft Power Plant EngineeringUnited States (Remote)RemoteThis role is designed for experienced aviation engineers with strong powerplant knowledge, commercial airline support experience and the ability to provide timely technical guidance for line maintenance, heavy maintenance, MRO support and Aircraft-On-Ground events. The ideal candidate will have an extensive background providing engineering technical support for aircraft maintenance operations and the ability to serve as a subject matter expert in powerplant engineering support.
High Pressure Boiler Operator (Black Seal) - Flexible Shifts (Per Diem) - Warren Campus St. Luke's Health Network, Inc.High Pressure Boiler Operator (Black Seal) - Flexible Shifts (Per Diem) - Warren CampusPhillipsburg, NJ$22.10–$35.36 / hourPart timeMaintain daily logs of operation, maintenance, repair, and safety activities including but not limited to test results, instrument readings, details of equipment malfunctions, preventive maintenance tasks, maintenance/repair work orders, complete shift check list. Perform scheduled preventive maintenance tasks, perform scheduled work order repair, overhaul/replace valves, pumps, burners, controls, alarms, and coils (steam/hot water) as directed by the Chief Engineer.
Experienced Heavy Equipment Operator $3500 Sign On Bonus Waste Management IncExperienced Heavy Equipment Operator $3500 Sign On BonusDecatur, IL$26.50–$28.50 / hourWM has the largest disposal network and collection fleet in North America, is the largest recycler of post‑consumer materials and is a leader in beneficial use of landfill gas, with a growing network of renewable natural gas plants and the most landfill gas‑to‑electricity plants in North America. Preferred Candidates Will Have: Various Heavy Equipment Experience Ranging from CAT Dozers D6-D8, CAT Loaders 960-980, CAT Excavators 330+ or comparable Heavy Equipment Experience.
Agricultural Equipment Operator EMPLOYMENT SECURITY DEPTAgricultural Equipment OperatorEverett, WA$17.13 / hourFull timeWork Tasks:Agriculture Workers (blueberry)Job RequirementsOrder Number: 293126708 2 Months experience • Exposure to extreme temp.• Lifting requirement of 60 lbs.• Repetitive Movements.• Frequent stooping or bending over.• Extensive sitting and walking.• Extensive pushing or pulling Workers will be responsible for all tractor ...
Heavy Equipment Operator - Dozer Operator Pro Site ConstructionHeavy Equipment Operator - Dozer OperatorMemphis, TennesseeThe ideal candidate will have experience operating heavy equipment in a civil construction environment and be committed to safely and efficiently performing grading, site preparation, and earthmoving activities. This position requires an individual who takes pride in maintaining equipment through daily preventative maintenance and keeping machinery clean and job-site ready.
Heavy Equipment Operator Landmark CompaniesHeavy Equipment OperatorMoorhead, MN$26–$32 / hourThis position requires strong attention to safety protocols, the ability to work in a fast-paced environment, solid understanding of construction site procedures, and working out of Moorhead for multiple days at a time that will require staying in a hotel. The ideal candidate will operate a variety of heavy machinery, such as excavators, bulldozers, and loaders, to assist in the construction, maintenance, and excavation of projects.
Laborer - Heavy Equipment Operator DOCLaborer - Heavy Equipment OperatorMiami, FloridaThe Heavy Equipment Operator is responsible for safely and efficiently operating a variety of heavy construction equipment—including excavators, bulldozers, loaders, graders, and backhoes—to support site development, earthmoving, trenching, grading, and material handling. Read and interpret site plans, grade stakes, and blueprints to execute work according to specifications.
Quarry Heavy Equipment Operator AMAT CentralQuarry Heavy Equipment OperatorTahlequah, OKAPAC Central Inc., is a CRH company producing and providing crushed aggregate materials, sand, ready-mix concrete, asphalt, and performing as a regional heavy highway/infrastructure construction firm serving Arkansas, Oklahoma, and southern Missouri. · Comfortable working in all weather conditions; exposed to jobsite hazards such as moving machinery, high places, airborne particles, and loud environments.
NewLaborer Installer Mountain Ltd.Laborer InstallerHessmer, LAGeneral knowledge of construction practices; · Knowledge of traffic laws, ordinances, rules involved in equipment operation, hazards and applicable safety rules and precautions for heavy. We are a national leader in the industry, providing high-quality engineering, on-time service delivery, and skilled personnel paired with innovative technology and creative solutions.
NewSurface Heavy Equipment Operator Warrior Met Coal IncSurface Heavy Equipment OperatorBrookwood, ALMust be able to work in extreme conditions, including but not limited to changing weather conditions, dust, mud, varying levels of noise from low to high decibels, varying degrees of light and dark, in and around artificial light and in a confined work area. About the Role: As a Heavy Equipment Operator, you will operate various size dozers, loaders, haulage trucks and other various equipment associated with a preparation plant in a safe and efficient manner.
NewSurface Heavy Equipment Operator Warrior Met Coal, Inc.Surface Heavy Equipment OperatorBrookwood, ALMust be able to work in extreme conditions, including but not limited to changing weather conditions, dust, mud, varying levels of noise from low to high decibels, varying degrees of light and dark, in and around artificial light and in a confined work area. About the Role: As a Heavy Equipment Operator, you will operate various size dozers, loaders, haulage trucks and other various equipment associated with a preparation plant in a safe and efficient manner.
NewDriver - CDL A Sunbelt RentalsDriver - CDL AWest Seneca, NY$27.07–$40.59 / hourRelated experience may include: Long Haul Driver, Heavy Haul Driver, Lowboy Driver, Equipment Driver, Equipment Operator, Owner-Operator, Delivery Driver. This role will generally drive a Class A truck hauling equipmenton on a flatbed (dovetail) or RGN (lowboy) trailer in a variety of conditions, including urban, suburban, rural settings.
NewCDL A Driver Sunbelt RentalsCDL A DriverNashville, TN$27.07–$40.59 / hourRelated experience may include: Long Haul Driver, Heavy Haul Driver, Lowboy Driver, Equipment Driver, Equipment Operator, Owner-Operator, Delivery Driver. This role will generally drive a Class A truck hauling equipmenton on a flatbed (dovetail) or RGN (lowboy) trailer in a variety of conditions, including urban, suburban, rural settings.
NewDriver (Class A CDL) - Scaffold Sunbelt RentalsDriver (Class A CDL) - ScaffoldFort Lauderdale, FL$27.07–$40.59 / hourRelated experience may include: Long Haul Driver, Heavy Haul Driver, Lowboy Driver, Equipment Driver, Equipment Operator, Owner-Operator, Delivery Driver. This role will generally drive a Class A truck hauling equipmenton on a flatbed (dovetail) or RGN (lowboy) trailer in a variety of conditions, including urban, suburban, rural settings.
NewLocator Technician for Horizontal Directional Drilling- Fiber Construction TDS TelecomLocator Technician for Horizontal Directional Drilling- Fiber ConstructionPlymouth, WITDS Telecom provides high-speed internet, TV entertainment, and phone services to a diverse range of communities, including small to mid-sized urban, suburban, and rural areas across the U.S. With over 50 years of experience, TDS is committed to building and expanding fiber optic networks that bring cutting-edge connectivity to neighborhoods nationwide. 6+ months experience in any combination of the following areas: customer service, electrical or utility construction, -OR-technical certification (or higher) -OR- current military service, or prior military service with honorable discharge.
NewExcavator / Heavy Equipment Operator NERI BUILDING AND DEVELOPMENT LLCExcavator / Heavy Equipment OperatorPlainville, CTFull timeThe right candidate should be able to look at a project, understand what needs to be accomplished, maintain proper grades, work efficiently, protect the equipment, and produce professional results without requiring constant supervision. The ideal candidate is comfortable working independently, understands grades and site plans, and is willing to work outside of the machine when necessary to help get the job done.
Heavy Equipment Operator STOCKS GENERAL CONTRACTORS LLCHeavy Equipment OperatorFredericksburg, VAFull timeThis role is ideal for an experienced operator who can safely and efficiently run heavy equipment while working alongside pipe crews to ensure accurate, high-quality job site execution. We’re looking for operators who take pride in their work and want to grow with a company committed to safety, quality, and long-term success.
Heavy Equipment Operator - Aggregate Croell IncHeavy Equipment Operator - Aggregatenew hampton, IA$25–$35 / hourTake ownership of your role by completing pre- and post-shift equipment inspections, servicing equipment, and producing products efficiently and safely while working with a team that feels like family. Primary Responsibilities: Operate a full range of heavy equipment (i.e. skid steer loader, front-end loader, excavator, crusher, dredge, dozer, backhoe, etc.).
NewJourneyman Truck Technician / Mechanic - Day Shift Pape' KenworthJourneyman Truck Technician / Mechanic - Day ShiftKlamath Falls, OR$35.35–$39.903 or more years of experience working on all makes and models of medium and heavy-duty class 7/8 trucks, including engine repair, electronic trouble-shooting, HVAC systems, and chassis repair. That may mean repairing or rebuilding cabs, steering systems, engines, transmissions, axles, differentials, brakes, clutches, electrical systems, or air systems.