Scheduler Tutor Perini CorpSchedulerFresno, CA$100,000–$130,000 / yearIt includes 12 roadway / railroad grade separations, two mainline viaducts, one tunnel, realignments of existing railroad tracks, utility relocations, roadway relocations, two trench sections, and a major river crossing over the San Joaquin River. You will be responsible for building and updating schedules as various milestones and project deliverables are completed or added to the scope of work, while also providing updates to key project team members on the progress of project.
Senior Project Controls Analyst GTTSenior Project Controls AnalystFresno, CAMinimum 5 years of experience as a Project Controls Analyst, or relevant experience in electric or gas transmission and distribution operations, project management, accounting, finance, construction management, or business planning. The analyst develops and maintains detailed project schedules, monitors cost and schedule performance, and produces reports that support project decision-making and financial oversight.
Project Manager-Utility Experience TerravantaProject Manager-Utility ExperienceSan Joaquin, Californiadiv>Requirements: Bachelor’s degree in applicable profession, business, or technical discipline or an equivalent combination of education, training, and experience Minimum 7 years of project management experience with projects in the field. Responsive recruiterBenefits:Competitive salary.TRANSPORTATION ENGINEER (CIVIL) State Of CaliforniaTRANSPORTATION ENGINEER (CIVIL)Fresno, CA$6,488–$12,152 / yearThe incumbent is responsible for overseeing and inspecting portions of the design and construction, such as bridges, retaining walls, Mechanically Stabilized Earth (MSE) walls, and other structures, including guideways, drainage, concrete and asphalt pavement, embankments, barriers, utilities, traffic control, striping and signs, sidewalks, railroad, and other civil work for the complex Construction Package mega-project, including overseeing the Design Build (DB) contractor's efficient design and construction of a quality facility within the project's cost, scope, and schedule. The position involves exposure to night work, field work, earthwork, paving operations, lab work, fog, weather conditions, chemicals, lab conditions, equipment, machinery, heat, cold, dust, gas, fumes, outdoor conditions, indoor conditions, humidity, and high noise levels.SUPERVISING TRANSPORTATION ENGINEER, CALTRANS State Of CaliforniaSUPERVISING TRANSPORTATION ENGINEER, CALTRANSFresno, CA$13,892–$15,782 / yearThe position requires extensive knowledge of transportation engineering principles, rail system requirements, construction practices, and contract administration to ensure consistent oversight and the timely, cost-effective, and technically compliant delivery of all TSCC elements. The incumbent ensures contract requirements are properly implemented, reviews and approves technical documentation, evaluates design and construction deliverables for conformance to applicable codes and performance criteria, and recommends corrective actions when deficiencies are identified.PRINCIPAL TRANSPORTATION ENGINEER, CALTRANS State Of CaliforniaPRINCIPAL TRANSPORTATION ENGINEER, CALTRANSFresno, CA$15,263–$17,336 / yearThe incumbent exercises political acumen and works effectively with diverse internal and external parties, including the Authority's Board of Directors, the executive team and other administrators, community and business leaders, and elected officials at all levels and their staff. The incumbent occasionally works outdoors at construction sites to support pre and post-award site visits and surveys, and may be exposed to dirt, noise, inclement weather, and extreme heat or cold.Fabrication Technician R.F MacDonald CoFabrication TechnicianFresno, CAp>Our expectation is for the Fabrication Technician to be performing pressure vessel repairs, general repair of boilers, welding, pipe fitting, and other Skid buildout processes. The Fabrication Technician position must complete responsibilities delegated by the Fabrication & Rental manager/Foremen that include the fabrication of Skids and Maintenance of Rental boilers and related accessories.SENIOR ENVIRONMENTAL SCIENTIST (SPECIALIST) State Of CaliforniaSENIOR ENVIRONMENTAL SCIENTIST (SPECIALIST)Fresno, CA$7,820–$10,732 / yearThe incumbent is responsible at a programmatic level for ensuring the Authority is fulfilling its mitigation commitments contained in Final Environmental Impact Reports/Environmental Impact Statements (EIR/EIS) and permitting documents (i.e., environmental permits), throughout the different phases of project delivery. Artificial intelligence (AI) tools such as ChatGPT, website searches, and third-party reviewers can be helpful in researching responses to the SOQ; however, by submitting your application for this position, you understand and acknowledge the SOQ you submit is your own work, in your own words, and accurately reflects your knowledge, skills, abilities, and experiences.SENIOR ENVIRONMENTAL SCIENTIST (SUPERVISORY) State Of CaliforniaSENIOR ENVIRONMENTAL SCIENTIST (SUPERVISORY)Fresno, CA$10,854–$13,493 / yearUnder the general direction of the California High-Speed Rail Authority's (Authority) Environmental Program Manager I EPM I), the incumbent serves as the Senior Environmental Scientist (Supervisory) (Environmental Compliance Manager) in the Environmental Services Branch. Using the online application system as specified in the announcement is the preferred method of applying for civil service job opportunities; however, applicants may instead apply by way of U.S. mail, parcel delivery or courier service, or in person, as set forth in this announcement.SUPERVISING TRANSPORTATION PLANNER State Of CaliforniaSUPERVISING TRANSPORTATION PLANNERFresno, CA$10,551–$11,981 / yearArtificial intelligence (AI) tools such as ChatGPT, website searches, and third-party reviewers can be helpful in researching responses to the SOQ; however, by submitting your application for this position, you understand and acknowledge the SOQ you submit is your own work, in your own words, and accurately reflects your knowledge, skills, abilities, and experiences. Under the general direction of the California High-Speed Rail Authority's (Authority) Deputy Director of Architecture and Development, the Supervising Transportation Planner (Station Development Manager), is responsible for directing a variety of complex activities related to the advancement of the Authority's station planning and delivery.Load moreResume ResourcesFree Resume TemplatesFree Resume BuilderSimilar Job SearchesHelper JobsLaborer Jobs
TRANSPORTATION ENGINEER (CIVIL) State Of CaliforniaTRANSPORTATION ENGINEER (CIVIL)Fresno, CA$6,488–$12,152 / yearThe incumbent is responsible for overseeing and inspecting portions of the design and construction, such as bridges, retaining walls, Mechanically Stabilized Earth (MSE) walls, and other structures, including guideways, drainage, concrete and asphalt pavement, embankments, barriers, utilities, traffic control, striping and signs, sidewalks, railroad, and other civil work for the complex Construction Package mega-project, including overseeing the Design Build (DB) contractor's efficient design and construction of a quality facility within the project's cost, scope, and schedule. The position involves exposure to night work, field work, earthwork, paving operations, lab work, fog, weather conditions, chemicals, lab conditions, equipment, machinery, heat, cold, dust, gas, fumes, outdoor conditions, indoor conditions, humidity, and high noise levels.
SUPERVISING TRANSPORTATION ENGINEER, CALTRANS State Of CaliforniaSUPERVISING TRANSPORTATION ENGINEER, CALTRANSFresno, CA$13,892–$15,782 / yearThe position requires extensive knowledge of transportation engineering principles, rail system requirements, construction practices, and contract administration to ensure consistent oversight and the timely, cost-effective, and technically compliant delivery of all TSCC elements. The incumbent ensures contract requirements are properly implemented, reviews and approves technical documentation, evaluates design and construction deliverables for conformance to applicable codes and performance criteria, and recommends corrective actions when deficiencies are identified.
PRINCIPAL TRANSPORTATION ENGINEER, CALTRANS State Of CaliforniaPRINCIPAL TRANSPORTATION ENGINEER, CALTRANSFresno, CA$15,263–$17,336 / yearThe incumbent exercises political acumen and works effectively with diverse internal and external parties, including the Authority's Board of Directors, the executive team and other administrators, community and business leaders, and elected officials at all levels and their staff. The incumbent occasionally works outdoors at construction sites to support pre and post-award site visits and surveys, and may be exposed to dirt, noise, inclement weather, and extreme heat or cold.
Fabrication Technician R.F MacDonald CoFabrication TechnicianFresno, CAp>Our expectation is for the Fabrication Technician to be performing pressure vessel repairs, general repair of boilers, welding, pipe fitting, and other Skid buildout processes. The Fabrication Technician position must complete responsibilities delegated by the Fabrication & Rental manager/Foremen that include the fabrication of Skids and Maintenance of Rental boilers and related accessories.
SENIOR ENVIRONMENTAL SCIENTIST (SPECIALIST) State Of CaliforniaSENIOR ENVIRONMENTAL SCIENTIST (SPECIALIST)Fresno, CA$7,820–$10,732 / yearThe incumbent is responsible at a programmatic level for ensuring the Authority is fulfilling its mitigation commitments contained in Final Environmental Impact Reports/Environmental Impact Statements (EIR/EIS) and permitting documents (i.e., environmental permits), throughout the different phases of project delivery. Artificial intelligence (AI) tools such as ChatGPT, website searches, and third-party reviewers can be helpful in researching responses to the SOQ; however, by submitting your application for this position, you understand and acknowledge the SOQ you submit is your own work, in your own words, and accurately reflects your knowledge, skills, abilities, and experiences.
SENIOR ENVIRONMENTAL SCIENTIST (SUPERVISORY) State Of CaliforniaSENIOR ENVIRONMENTAL SCIENTIST (SUPERVISORY)Fresno, CA$10,854–$13,493 / yearUnder the general direction of the California High-Speed Rail Authority's (Authority) Environmental Program Manager I EPM I), the incumbent serves as the Senior Environmental Scientist (Supervisory) (Environmental Compliance Manager) in the Environmental Services Branch. Using the online application system as specified in the announcement is the preferred method of applying for civil service job opportunities; however, applicants may instead apply by way of U.S. mail, parcel delivery or courier service, or in person, as set forth in this announcement.
SUPERVISING TRANSPORTATION PLANNER State Of CaliforniaSUPERVISING TRANSPORTATION PLANNERFresno, CA$10,551–$11,981 / yearArtificial intelligence (AI) tools such as ChatGPT, website searches, and third-party reviewers can be helpful in researching responses to the SOQ; however, by submitting your application for this position, you understand and acknowledge the SOQ you submit is your own work, in your own words, and accurately reflects your knowledge, skills, abilities, and experiences. Under the general direction of the California High-Speed Rail Authority's (Authority) Deputy Director of Architecture and Development, the Supervising Transportation Planner (Station Development Manager), is responsible for directing a variety of complex activities related to the advancement of the Authority's station planning and delivery.