Electrical Engineer - Data Centers Slb NVElectrical Engineer - Data CentersHouston, TXDetailed understanding of UPS (uninterruptable power sources), diesel generators, medium and low voltage electrical switchgear, power distribution units, variable frequency drives, automatic/static transfer switches, electrical control systems, low voltage rectification systems, and other critical electrical equipment found within data centers. SLB New Energy & Industrial (NEI) is a division of SLB; our portfolio includes ventures in carbon capture and sequestration, geothermal power, energy storage, sustainable battery-grade lithium, hydrogen and Data center infrastructure solutions.
Piping & Mech Eqpt Engineer-Data Center Slb NVPiping & Mech Eqpt Engineer-Data CenterHouston, TXDetailed understanding of chillers, cooling towers, direct and indirect evaporative cooling, mechanical control systems, fan systems, acoustics, pumps, vessels, valves, coolers, and other critical mechanical equipment and systems found within data centers. Review and monitor Engineering work, as required, to assure accuracy and conformance with Client and / or Company Specifications, governing codes, good engineering practices, good safety practices, project procedures, and job requirements.
Senior Project Controls Specialist Sterling Engineering, Inc.Senior Project Controls SpecialistHouston, TX$85–$105 / hourJoining this team offers the opportunity to work in a highly regulated, high-stakes environment supporting the successful execution of critical infrastructure from initial design through final delivery. Direct experience in nuclear power plant outages or nuclear projects is required, including familiarity with unique regulatory and technical challenges.
HVAC/Mechanical Project Manager GpacHVAC/Mechanical Project ManagerHouston, TX90000–110000Related Titles: HVAC Project Manager, HVAC Estimation Specialist, Project Estimator (HVAC), Senior HVAC Project Coordinator, HVAC Project Lead, HVAC Construction Manager, Estimating and Project Management Specialist, HVAC Project Analyst, Commercial HVAC Project Manager, Industrial HVAC Project Coordinator. Estimation Expertise: Proficiency in estimating HVAC project costs, crafting cost estimates, reviewing plans and specifications, researching materials, reading blueprints, evaluating bids, and preparing proposals.
Senior Project Controls Specialist (P6) Johnson Service GroupSenior Project Controls Specialist (P6)Houston, TXApplicants must have first-hand project experience in nuclear power plant outages or nuclear projects , demonstrating a deep understanding of the unique regulatory, technical, and logistical challenges inherent in the nuclear industry. Minimum of 15 years of full-time working experience in project scheduling within large-scale projects or programs (preferably in energy, infrastructure, or industrial sectors), with at least 5 of those years working with Primavera P6, is required.
Project Manager Hut 8Project ManagerHouston, TXThe Project Manager manages day-to-day execution of a data center build across internal teams, EPC partners, and vendors, and is accountable for driving actions, risks, and deliverables to closure. At Hut 8, you will have the opportunity to: Work with bright, driven peers from a range of educational and professional backgrounds including software development, energy, engineering, entrepreneurship, investment banking, private equity, and management consulting.
Project Controls Specialist Sr - CP (2205) Entergy CorporationProject Controls Specialist Sr - CP (2205)The Woodlands, TXThis includes providing guidance and direct oversight to Project Controls Specialists throughout the project lifecycle, integrating with the Project Management team to facilitate successful project execution, and ensuring that projects deliver reliable cost and schedule estimates, meeting business objectives on time and within budget. WORKING CONDITIONS: As a provider of essential services, Entergy expects its employees to be available to work additional hours, to work in alternate locations, and/or to perform additional duties in connection with storms, outages, emergencies, or other situations as deemed necessary by the company.
Manufacturing Operations Project Manager I Comfort Systems USAManufacturing Operations Project Manager IHouston, TXPOSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
Manufacturing Operations Project Manager II Comfort Systems USAManufacturing Operations Project Manager IIHouston, TXThis role ensures on-time, on-budget, and high-quality delivery by owning execution strategy and leading cross-functional coordination across Manufacturing, Engineering, Project Management, Purchasing, Quality, Logistics, and Production Planning. "smoking" and "tobacco or nicotine products" includes, but is not limited to, products such as cigarettes, e-cigarettes, cigars, pipes, vaping, all forms of smokeless tobacco (chewing tobacco, snuff, dip) and clove cigarettes.
Manufacturing Operations Project Manager 1 Comfort Systems USAManufacturing Operations Project Manager 1Houston, TXPOSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
TAS-OPM1 - Operations Project Manager 1 Comfort Systems USA IncTAS-OPM1 - Operations Project Manager 1Houston, TXPOSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
Manufacturing Operations Project Manager I Comfort SystemsManufacturing Operations Project Manager IHouston, TexasPOSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
Manufacturing Operations Project Manager II Comfort SystemsManufacturing Operations Project Manager IIHouston, TexasThis role ensures on-time, on-budget, and high-quality delivery by owning execution strategy and leading cross-functional coordination across Manufacturing, Engineering, Project Management, Purchasing, Quality, Logistics, and Production Planning. “smoking” and “tobacco or nicotine products” includes, but is not limited to, products such as cigarettes, e-cigarettes, cigars, pipes, vaping, all forms of smokeless tobacco (chewing tobacco, snuff, dip) and clove cigarettes.
Manufacturing Operations Project Manager 1 Comfort SystemsManufacturing Operations Project Manager 1Houston, TexasPOSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
Manufacturing Operations Project Manager 1 TASManufacturing Operations Project Manager 1Houston, TexasJob Description POSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
Manufacturing Operations Project Manager II TASManufacturing Operations Project Manager IIHouston, TexasThis role ensures on-time, on-budget, and high-quality delivery by owning execution strategy and leading cross-functional coordination across Manufacturing, Engineering, Project Management, Purchasing, Quality, Logistics, and Production Planning. “smoking” and “tobacco or nicotine products” includes, but is not limited to, products such as cigarettes, e-cigarettes, cigars, pipes, vaping, all forms of smokeless tobacco (chewing tobacco, snuff, dip) and clove cigarettes.
Manufacturing Operations Project Manager I TASManufacturing Operations Project Manager IHouston, TexasPOSITION OVERVIEW: The Operations Project Manager I is responsible for ensuring on-time and on-budget delivery of high-quality products by coordinating and managing the activities of Manufacturing, Engineering, Project Management and Purchasing as well as verifying that all needed information such as drawings, specifications, bills of material (BOM), work orders, and materials are available and accurate prior to and during the manufacturing process. When you join TAS, you join a Houston-headquartered company that is part of a large Houston-headquartered publicly traded company, Comfort Systems USA, with a solid reputation built on outstanding value, integrity, and customer focus.
NewProject Procurement Manager Acteon Group LtdProject Procurement ManagerHouston, TXWorking with the Project Manager, Project Director, Project Cost Controller, Project Planner / Scheduler, Engineering, Operations, Finance, and Legal, the role secures required goods and services while protecting cost, schedule, quality, and commercial objectives. Vacancy NameProject Procurement Manager Vacancy NoVN4515 Operating CompanyInterMoor US Group AdvertIntermoor, Acteon's Moorings and Anchors business line, provides project and operational management expertise to customers across the mooring lifecycle.
Piping Designer Senior Audubon Engineering Co LPPiping Designer SeniorHouston, TXUtilize engineering sketches, specifications and supporting documents in the designing, detailing, documenting, and verifying of Piping parts, subassemblies, assemblies or system configurations. Analyze the effect of proposed changes for proper fit and/or interference problems and recommend possible solutions or alternate construction options.
NewPiping Design Specialist Senior Audubon Engineering Co LPPiping Design Specialist SeniorHouston, TXUtilize engineering sketches, specifications and supporting documents in the designing, detailing, documenting, and verifying of Piping parts, subassemblies, assemblies or system configurations. The Senior Piping Design Specialist will perform, assignments associated with designing 3D Models, Piping plans, and Isometric equipment, components, structures or systems.