Sales Store Checker U.S. Department of DefenseSales Store CheckerSC$17.47–$21.46 / hourWithin the best qualified category, candidates are referred in the following order: adjudicated veterans preference candidates with 10-point preference, adjudicated veterans preference candidates with other than 10-point preference, military spouse preference candidates, and candidates with no preference. The document must include the following information: (1) service members name, (2) date of the expected separation from active duty, (3) expected character of the active duty service at separation, (4) pay grade/rank/rate at separation, (5) dates of active duty service, and (6) any campaign or expeditionary medals received.
Account Executive RTM Business GroupAccount ExecutiveCharleston, SCRemote$55,000–$75,000Our team travels together which is a truly unique experience, different from “traditional” work travel, which in turn cultivates interdepartmental relationships and friendships that drive our collaborative culture. Responsibilities: Drive sales process from end to end: lead prospecting, deal closing and account management for repeat and future business opportunities.
Weather Forecaster/Observer (Antarctica) Chickasaw Nation IndustriesWeather Forecaster/Observer (Antarctica)Charleston, South CarolinaExperience should include recording and dissemination of surface and rawinsonde observations, completion of forms in accordance with Federal, DoD, and World Meteorological Organization (WMO) guidelines, observation of local area surface and high altitude weather conditions, recording, transmitting, and archiving METAR, SPECI, Synoptic, AIREPS, and upper-air weather observations, maintaining climatological databases, operating data collection systems, and performing quality control. The Weather Forecaster/Observer provides aviation, ship and site weather forecasting services, maintaining responsibility for developing forecasts and preparing weather briefings for pilots and interested parties such as outlying camps, field parties, and stations, as well as any contracted ocean vessels operating in the area of responsibility.
Senior Technology Project Manager - Enterprise Technology PMO MaximusSenior Technology Project Manager - Enterprise Technology PMOCharleston, SCFull timeLead and develop program resources (direct reports and/or matrixed team members) through clear goal setting, prioritization, coaching, performance feedback, and escalation management; drive accountability by influence across engineering, product, operations, and vendors to deliver integrated program outcomes. Maximus compensation is based on various factors including but not limited to job location, a candidate's education, training, experience, expected quality and quantity of work, required travel (if any), external market and internal value analysis including seniority and merit systems, as well as internal pay alignment.
NewSystems Administration Analyst (Business Analysis, Senior Analyst) The Mil CorpSystems Administration Analyst (Business Analysis, Senior Analyst)Charleston, SC$91,000–$97,000 / yearThe MIL Corporation (MIL) is a dynamic workforce of industry professionals who deliver world-class solutions in cyber, engineering, financial management, and information technology - and we are looking for candidates like you! 2017, 2020 - 2025 Top Workplace Award, South Carolina (Greenville Business Magazine, Columbia Business Monthly, and Charleston Business Magazine).
Electrical Design Engineer - SC RMF Engineering, IncElectrical Design Engineer - SCCharleston, SCRMF Engineering is an innovative, top-ranked, national engineering firm that specializes in providing design and engineering services for all aspects of building and utility infrastructure construction. RMF Engineering, Inc is currently seeking an Electrical Design Engineer in our South Carolina office.
Director, Emergency Management Recovery AC Disaster ConsultingDirector, Emergency Management RecoveryCharleston, SCRemote$136,000–$163,000The Director is responsible for service line operational performance, technical quality, client outcomes, and team leadership across FEMA Public Assistance (PA), Individual Assistance (IA), Hazard Mitigation Grant Program (HMGP), 404/406 Mitigation, CDBG-DR, and other disaster recovery and post-disaster hazard mitigation program and project implementation. The Director supports service line business development by providing subject matter expertise, capture input, and builds/maintains client relationships to support corporate growth efforts as directed by the VP of Recovery in all aspects of the Recovery portfolio as prescribed by the CEO and ACDC’s Corporate Values Platform .
Audit Manager KEARNEY & COMPANY, P.C.Audit ManagerCharleston, SC$77,000–$125,000 / yearThe Audit Manager will help develop and maintain productive working relationships with client personnel and assess clients' satisfaction, demonstrate proficiency with accounting and auditing concepts and apply them to client situations. Our commitment to our employees and clients as well as to dedication and trust, critical values to our Firm, have led to Kearney's recognition as one of the leading accounting firms in the country.
Staff Information Security Engineer Lumos Networks Corp.Staff Information Security EngineerCharleston, SC$116,025–$140,000 / yearPreferred Experience: Experience with asset discovery and logical asset managementSolid understanding of authentication and identity technologies (IAM, SSO, RADIUS, TACACS+, AD/LDAP/Kerberos)Experience with compliance frameworks, particularly NIST CSF, NIST 800-53, and/or ISO 27001Experience with administration of Splunk, Splunk ES or other SIEM platformsFamiliarity with Infrastructure as Code and automation tools (Terraform, Ansible, git)Familiarity with AWS, Microsoft Azure, and Office 365 security controls (e.g., IAM, PIM, Identity Governance, Azure Policies, Entra, Intune, DLP, IaaS)Familiarity with EDR/MDR/XDR platformsExperience with security incident responseStrong understanding of operating systems and command line administration at all levels. Strong understanding of TCP/IP networking protocols at all layers of the OSI stackUnderstanding of the HTTP protocol, Web Application Firewall (WAF) technologies, BurpSuite testing, and APIsUnderstanding of PKI, SSL/TLS, and cryptographic functionsExperience working in micro-segmented environmentsComfortable with regular expressions.
Assistant Project Manager/Roadway Engineer STVAssistant Project Manager/Roadway EngineerNorth Charleston, South CarolinaAssist senior project managers with to create, maintain, and monitor scopes, fees, schedules, staffing projections, risk registers, sub agreements, QC records, deliverable submittals, and invoices. •Provide schematic/functional designs, roadway geometry, roadway details, drainage, work zone traffic control, pavement markings, and signing for transportation infrastructure.
Senior Traffic Engineer, Project Manager - Transportation Sector STV Group IncSenior Traffic Engineer, Project Manager - Transportation SectorNorth Charleston, SCProvide and lead traffic engineering studies such as traffic impact analyses, traffic signal timing plans, microscopic and macroscopic simulation modeling, signal warrants, speed studies, capacity analysis, traffic operations, safety analysis, and parking studies. STV is seeking an energetic and highly motivated Senior Traffic Engineer/Project Manager for either our Columbia or North Charleston SC locations who will be responsible to provide leadership on traffic engineering projects.
NewAssembler-Operator I (Taps Chs) - 1St Shift Turbocam InternationalAssembler-Operator I (Taps Chs) - 1St ShiftLadson, SCOur Culture In Action: Here at TURBOCAM, we have a Commitment to Excellence in everything that we do - whether that's the delivery of flow path components and innovative manufacturing solutions, our relationships with customers around the globe, or the investment in those that make TURBOCAM such an exceptional place to work. Enjoy comprehensive benefits with company-paid dental and life insurance (with optional add-ons for yourself and dependents), short- and long-term disability, subsidized medical (or medical opt-out bonus if covered elsewhere), and voluntary vision coverage.
Paraplanner, Associate Advisor Apollon Wealth ManagementParaplanner, Associate AdvisorCharleston, SCFull timeOur practice is growing with a clear long-term vision: become the preeminent special needs financial planning firm in the Southeast, built on a team model where skilled planners grow into trusted advisors with real client relationships and meaningful financial participation in the results they produce. Support seasonal planning workflows across our three structured meeting seasons — spring (tax planning and plan refresh), summer (insurance, estate review, mid-year check-ins), and fall (year-end planning and investment review).
Maintenance Coordinator State of South CarolinaMaintenance CoordinatorBerkeley County, SC$37,200–$48,300 / yearDisabilities include, but are not limited to: •Blindness •Autism •Bipolar disorder •Post-traumatic stress disorder (PTSD) •Deafness •Cerebral palsy •Major depression •Cancer •HIV/AIDS •Multiple sclerosis (MS) •Obsessive compulsive disorder •Diabetes •Schizophrenia •Missing limbs or partially missing limbs •Impairments requiring the use of a wheelchair •Epilepsy •Muscular dystrophy •Intellectual disability (previously) called mental retardation OMB Control Number 1250-005 Expires 1/31/2017. These classifications are defined as follows: A "disabled veteran" is one of the following: a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or a person who was discharged or released from active duty because of a service-connected disability.
National Sales Representative Anderson Trucking ServiceNational Sales RepresentativeLadson, South Carolina$50,000–$57,000 / yearSi E-Verify no puede confirmar su autorización, se le darán instrucciones por escrito y la oportunidad de comunicarse con el Departamento de Seguridad Nacional (DHS) o la Administración del Seguro Social (SSA) para resolver el problema antes de que se tome cualquier medida en su contra, incluida la terminación del empleo. Click Apply Now to take the next step in a sales career with real earning potential and a team that wants you to succeed or visit us at Corporate Career Openings | ATS to see full list of our openings and learn more about ATS!
Project Superintendent - Charleston, SC SJ Hamill Construction LLCProject Superintendent - Charleston, SCCharleston, SCManage construction operations for Heavy Civil, Bridge, and Marine project operations including pile driving, concrete formwork, barge handling, and crane operations. This position plays a key leadership role in project execution, coordinating with project management, craft leadership, and support personnel to deliver work efficiently and to specification.
Performance Improvement Mgr TriWest Healthcare AlliancePerformance Improvement MgrCharleston, SCRemoteFull timeThis individual contributor role leads enterprise-wide Quality Improvement Projects (QIPs) focused on operational excellence, Corrective Action Request (CAR) responses, and measurable stakeholder outcomes. Multi-Tasking / Time Management: Prioritize and manage multiple concurrent initiatives to meet changing deadlines and requirements within a high-volume environment, including project timelines, deliverables, and key performance indicators.
Chemotherapy/Infusion Registered Nurse AptiveChemotherapy/Infusion Registered NurseCharleston, South CarolinaFull timeThe Chemotherapy / Infusion Registered Nurse (RN) is a highly skilled professional nurse who provides specialized nursing care to patients receiving chemotherapy, immunotherapy, and infusion-related treatments within the Chemotherapy & Infusion Suite. Administer, monitor, document, and evaluate chemotherapy, biotherapy, immunotherapy, blood products, iron infusions, antibiotics, IV fluids, and other prescribed treatments in accordance with ONS guidelines and medical center policies.
Senior Program Manager Leonardo DRS IncSenior Program ManagerGoose Creek, SCExperience throughout the program lifecycle from development through sustainment to include: proposal development, requirements decomposition, generation of system and subsystem statements of work and subcontracts, risk management, and continuous improvement efforts including implementation cost reduction and performance improvement efforts. The Leonardo DRS Naval Power Systems business is a trusted provider of innovative naval gas and hybrid power systems, control technology and support solutions for the U.S. Navy and navies around the world.
Lead Sustainability Engineer RMF Engineering, IncLead Sustainability EngineerCharleston, SCVISION AND GOALS : In response to the industry-wide movement toward more sustainable building and utility systems, combined with prevalent sustainability requirements from our clients, RMF established a formal sustainability practice in 2022 and hired a Director of Sustainability to develop and oversee a companywide sustainability strategy. Our focus in this area, combined with our strong history of existing relationships and engineering excellence, allows RMF to add great value to clients who are focused on ambitious energy efficiency and sustainability goals.