Jacksonville, North Carolina28 days ago
This includes verifying design, installation, and system balancing, optimizing and verifying digital controls, verifying equipment start and operation for air handlers, chillers, pumps, boilers, terminal equipment, energy recovery, renewable energy, and distribution systems. Witness mechanical system testing consisting of site inspection, testing, adjusting and balancing (TAB) verification, duct air leakage tests(DALT) and performance verification testing (PVT) for facility HVAC and other mechanical systems prior to construction completion.