Build full battery model content as required (structure, plastics, HV network, adhesives, potting) and connect to BIW using subsystem include files and master connection files (including BIW-to-subsystem connection files). Ensure subsystems are massed per BOM; represent non-modeled content using NSM cards/mass elements and manage trimmed mass and CoG targets as required.