May include, Mortenson BIM/VDC uses existing conditions modeling, cost estimation, phase planning (4D), site analysis, design reviews, 3D visualization, 3D coordination, site utilization planning, construction system design, digital fabrication, 3D control planning and record modeling. Familiarity with the following workflows and solutions is preferred but not required; game engine technologies (Unity, Unreal, Lumion 3D), Parametric Analysis solutions (Dynamo, Grasshopper, Solibri), basic key frame animation, 2D/3D rendering capabilities, 2D/3D postproduction capabilities.