CHST need - Data Center Construction/Cheyenne, WY

Code Red Safety
  • Cheyenne, Wyoming
  • Autofill and Review
30+ days ago

Job Description

Code Red Safety is looking for a Safety Manager with a current CHST for a project in Cheyenne, WY.  Work is already underway and this role will be added to the site ASAP.  The project is anticipated to run for approximately 8 months.  The standard work schedule is 60 hours per week, however there could be additional significant overtime.  

Applicants MUST meet the following requirements:
  • Have 5-10 years of commercial construction safety experience
  • Site requires one of the following BCSP certifications: CHST, STS-C, ASP or GSP.
  • In addition, must also have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar
  • Data Center construction experience a plus
  • Must have a current FA/CPR
  • Must be able to pass a drug test & background check. 
Code Red Safety specializes in placing qualified safety professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis. If you meet the qualifications, and are interested in the position, please apply.  If you are determined to be a good candidate for this project, we will be in touch to discuss additional details. 


 

Numbers & Facts

LocationCheyenne, Wyoming

Skills

  • Background Investigationunmatched
  • C Programming Languageunmatched
  • CPR Certificationunmatched
  • Code Redunmatched
  • Constructionunmatched
  • GSP (Good Safety Practices)unmatched
  • Microsoft Active Server Page (ASP)unmatched
  • Network Operations Centerunmatched
  • OSHAunmatched
  • Safety Codesunmatched

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder