Construction Scheduler

Embark Recruiting Solutions
  • Columbus, Ohio
  • Autofill and Review
30+ days ago

Job Description

Title: Construction Scheduler

Location: Columbus, OH

Duration: Direct Hire

Our client, located in Columbus OH, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:

  • The scheduler shall have an in-depth knowledge of construction practices and sequencing
  • The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team
  • Analyze scheduling scenarios to assist the project team
  • The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)
  • Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

Experience:

  • Must have a minimum of 3-5 years’ scheduling experience
  • BS degree in Civil Engineering or Building/Construction Management is preferred
  • Strong background using Primavera P6 scheduling software
  • Experience with construction schedules for the design-build phase of the projects
  • Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues
  • Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis
  • Experience with time impact analysis
  • Construction claims and change order experience is preferred
  • Construction scheduler should have experience integrating the construction schedule into the master schedule
  • Candidate must be able to demonstrate excellent verbal and written communications skills
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

Numbers & Facts

LocationColumbus, Ohio

Skills

  • Analysis Skillsunmatched
  • Change Requests/Ordersunmatched
  • Civil Engineeringunmatched
  • Computer Skillsunmatched
  • Constructionunmatched
  • Construction Managementunmatched
  • Construction Scheduleunmatched
  • Construction Supportunmatched
  • Consultingunmatched
  • Critical Path Methodunmatched
  • Documentationunmatched
  • Identify Issuesunmatched
  • Microsoft Excelunmatched
  • Microsoft Officeunmatched
  • Microsoft Product Familyunmatched
  • Microsoft Projectunmatched
  • Microsoft Wordunmatched
  • Performance Analysisunmatched
  • Presentation/Verbal Skillsunmatched
  • Primaveraunmatched
  • Progress Reportsunmatched
  • Reporting Skillsunmatched
  • Schedule Developmentunmatched
  • Status Reportsunmatched
  • Value Analysisunmatched
  • Writing Skillsunmatched

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder