Data Center Construction Project Engineer

Macpower Digital Assets Edge Private Limited
  • Dallas, TX
  • $77,300–$116,300 Per Year
  • Instant Apply
1 day ago

Job Description

Job Summary: This position reviews design and bidding documents, evaluates contractor bids, and oversees construction progress and scheduling. Additionally, the Construction Project Engineer provides technical support to construction staff under the supervision of the Project Manager. The ideal candidate will be able to work independently but will work closely and report to a supervisor or manager. This position works on projects of limited complexity in a support role.
  • Compensation: Constructive is committed to fair and equitable compensation practices. The annual salary for this role is $77500 - $116300.00. This compensation will ultimately be in line with the location in which the position is filled. Final compensation for this role will be determined by various factors such as a candidate's relevant work experience, skills, certifications, and geographic location. This role is eligible for variable compensation including short term and long-term incentives.
  • Benefits: This position includes a comprehensive benefit package that includes medical, dental and vision plans; life, long-term disability, flexible spending, and health savings accounts, accrued paid time off, 8 paid Holidays, opportunity for overtime and 401(k) retirement benefits.
  • Travel: This is not a remote role and requires regular travel, 80% or more.
  • Physical Demands: While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion the incumbent may be required to stoop, bend or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision and ability to adjust focus.
Major Responsibilities:
  • Assist in the development of cost estimates.
  • Call subcontractors to develop interest in projects and accept invitation to bid.
  • Assist in Preconstruction.
  • Review plans and other technical documents.
  • Answer questions regarding the scope and/or timing of the project.
  • Monitor costs and project progress.
  • Maintain control of all project documentation.
  • Create, manage and track RFI's from the field to the architect/engineer of record.
  • Maintain/update project records.
  • Assist the project manager/superintendent in creating and distributing the project schedule.
  • Assist project team with conflict resolution between owner, contractor and subcontractor.
  • Turn in submittals from subcontractors to A/E for approval.
  • Assist project manager/owner in getting building permits for the project.
  • Create site SWPPP book and apply for state and local SWPPP permits/NOI's for the project.
  • Understand appropriate building codes/ regulations.
  • Coordinate project change-order management, creation and negotiation.
  • Conduct and document weekly project owner's meetings/decisions.
  • Assist the project team with site safety documentation and coordination.
  • Assist the project team with closeout of the project.
  • Assist project accountant with monthly subcontractor billings and pay applications.
  • Assist project manager with assigned tasks.
Minimum Job Requirements:
  • College Diploma in Construction Management.
  • 5+ years' Experience or degree as listed above.
  • 5 Years Data Center Experience.
Knowledge/Skills/Abilities:
  • Computer proficiency utilizing Microsoft Office Suite software (Word, Excel, Outlook, Power Point) and other applicable software programs
  • Demonstrate flexibility and is adaptable to change.
  • General knowledge of office protocol, routines and procedures.
  • Ability to read and comprehend plans and specifications.
  • Strong attention to detail, problem-solving skills and ability to meet deadlines.
  • Self-motivated and proactive and can accomplish tasks without direct oversight.
  • Proficient communication, interpersonal and organizational skills are essential.
  • Excellent tact and diplomacy in dealing with others and the ability to deal with all levels of management from field to corporate levels.
  • Team player and self-starter; strong analytical skills; strategic thinking abilities.
  • Proficiency with mobile devices and mobile form and capable of completing work assignments with little supervision.

Numbers & Facts

LocationDallas, TX
Salary$77,300–$116,300 Per Year

Skills

  • Accountingunmatched
  • Analysis Skillsunmatched
  • Billingunmatched
  • Building Codesunmatched
  • Building Permitsunmatched
  • Building Regulationsunmatched
  • Change Order Managementunmatched
  • Computer Skillsunmatched
  • Conflict Resolutionunmatched
  • Construction Engineeringunmatched
  • Construction Managementunmatched
  • Construction Projectsunmatched
  • Construction Supportunmatched
  • Cost Estimatesunmatched
  • Detail Orientedunmatched
  • Diploma of Managementunmatched
  • Document Managementunmatched
  • Documentationunmatched
  • Interpersonal Skillsunmatched
  • Lift/Move 25 Poundsunmatched
  • Microsoft Excelunmatched
  • Microsoft Officeunmatched
  • Microsoft Outlookunmatched
  • Microsoft PowerPointunmatched
  • Microsoft Wordunmatched
  • Mobile Devicesunmatched
  • Negotiation Skillsunmatched
  • Network Operations Centerunmatched
  • Organizational Skillsunmatched
  • People Managementunmatched
  • Physical Demandsunmatched
  • Problem Solving Skillsunmatched
  • Project Close-Outunmatched
  • Project Controlunmatched
  • Project Engineeringunmatched
  • Project Scheduleunmatched
  • Project Trackingunmatched
  • Project/Program Coordinationunmatched
  • Project/Program Managementunmatched
  • Team Playerunmatched
  • Technical Supportunmatched
  • Technical Writingunmatched
  • Time Managementunmatched
  • Willing to Travelunmatched

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder