At Fluor, we are proud to design and build projects and careers. We are committed to fostering a welcoming and collaborative work environment that encourages big-picture thinking, brings out the best in our employees, and helps us develop innovative solutions that contribute to building a better world together. If this sounds like a culture you would like to work in, you're invited to apply for this role.
Job Description
The purpose of this position is to manage a medium- to large-sized construction-only project, engineering, procurement, fabrication, and construction (EPFC) project, a large and/or strategic maintenance or evergreen project, large turnaround/outage, or complex fabrication effort; to oversee and direct the performance of all construction and related activities in conformance with contract, plans, specifications, schedules, and cost estimates. This position requires authoritative knowledge and background for the project type/magnitude/complexity, holistic grasp of complex situations with the ability to move between intuitive and analytical approaches with ease, and see the overall picture and alternative approaches. With command, this role directs all staff in all functions necessary in their roles to meet or exceed all project objectives. This position will typically be the lead person directing all construction activity for a project (s) including the office(s) and project site(s); commonly serving as the Site Manager - the lead staff position responsible for and directing all activities at the site.
Basic Job Requirements
Other Job Requirements
Preferred Qualifications
We are an equal opportunity employer. All qualified individuals will receive consideration for employment without regard to race, color, age, sex, sexual orientation, gender identity, religion, national origin, disability, veteran status, genetic information, or any other criteria protected by governing law.
Benefits Statement: Fluor is proud to offer a comprehensive benefits package designed to promote employee health, wellness, and financial security. Our offerings include medical, dental and vision plans, EAP, disability coverage, life insurance, AD&D, voluntary benefit plans, 401(k) with a company match, paid time off (personal, bereavement, sick, holidays) for salaried employees, paid sick leave per state requirement for craft employees, parental leave, and training and development courses.
Market Rate Statement: The market rate for the role is typically at the mid-point of the salary range; however, variations in final salary are determined by additional factors such as the candidate's qualifications, relevant years of experience, geographic location, internal pay equity, and prevailing market conditions for the specific role.
Notice to Candidates: Background checks are carried out as part of any conditional offer made, including (but not limited to & role dependent) education, professional registration, employment, references, passport verifications and Global Watchlist screening.
To be Considered Candidates: Must be authorized to work in the country where the position is located.
Salary Range: $166,500.00 - $309,500.00
| Location | Houston, TX |
| Salary | $166,500–$309,500 Per Year |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Resume Builder