Doc Control Specialist - Data Center Construction

Sundt Construction, Inc.
  • Lockhart, TX
  • Full-time
11 days ago

Job Description

JOB DESCRIPTION

Job Summary

Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site. This work will be performed under general supervision.

Key Responsibilities

1. Assists with the document preparation for scanning (i.e., removes all staples, paper clips).
2. Handles document retrieval requests, and assists in document reproduction .
3. Maintains the master project/drawing / specification files as the repository of design /construction documents.
4. Maintains transmittal logs and records and ensures compliance.
5. Organize, prepare and box in-active records for archives, storage, retention and/or destruction.
6. Responsible for maintenance of the project electronic and physical library records.
7. Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library.
8. Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.

Minimum Job Requirements

1. 3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
2. Familiarization with Prolog, ERP systems and other related project management software preferred.
3. Must be detailed oriented, have excellent organizational skills and have the ability to multi-task.
4. Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook.
5. Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience).
6. Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. May stoop, kneel, or bend, on an occasional basis
2. Must be able to comply with all safety standards and procedures
3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4. Will interact with people and technology frequently during a shift/work day
5. Will lift, push or pull objects pounds on an occasional basis
6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

Numbers & Facts

LocationLockhart, TX
Job TypeFull-time

Skills

  • Communication Skillsunmatched
  • Computer Systemsunmatched
  • Constructionunmatched
  • Construction Document Setunmatched
  • Contract Managementunmatched
  • Design Documentunmatched
  • Detail Orientedunmatched
  • Document Controlunmatched
  • Document Managementunmatched
  • ERP (Enterprise Resource Planning)unmatched
  • Email Technologyunmatched
  • File Maintenanceunmatched
  • File Systemsunmatched
  • Hazardous Materials/Substancesunmatched
  • High School Diplomaunmatched
  • Interpersonal Skillsunmatched
  • Machine Toolunmatched
  • Maintain Complianceunmatched
  • Material Movingunmatched
  • Microsoft Excelunmatched
  • Microsoft Officeunmatched
  • Microsoft Outlookunmatched
  • Microsoft Wordunmatched
  • Multitaskingunmatched
  • Network Operations Centerunmatched
  • Organizational Skillsunmatched
  • Physical Demandsunmatched
  • Presentation/Verbal Skillsunmatched
  • Project Management Softwareunmatched
  • Prolog Programming Languageunmatched
  • Quality Controlunmatched
  • Resource Managementunmatched
  • Safety Complianceunmatched
  • Safety Processunmatched
  • Safety Standardsunmatched
  • Safety/Work Safetyunmatched
  • Telephone Skillsunmatched
  • Writing Skillsunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder