Excavator Operator - Data Center Construction

Ella SA Contracting
  • El Paso, TX
  • Full-time
  • Autofill and Review
6 days ago

Job Description

We are seeking skilled Excavator Operators with experience handling underground utilities. Responsible for operating equipment to excavate ditches and structures, lay pipe and precast concrete structures, and general excavation and backfill work.

Responsibilities:
- Perform daily equipment maintenance and inspections
- Operate equipment in a safe and efficient manner
- Participate as a vital team member, contributing towards safety and success
- Follow safety policies and procedures
- Able to work in adverse weather conditions, hot or cold temperatures
- Other duties as assigned

Qualifications:
- 1+years of experience operating equipment
- OSHA 10 or higher
- Must have a strong commitment to jobsite safety
- Diligent in demonstrating safe work practices.
- Effective communication skills and ability to work as part of a team.

Physical Requirements:
The Excavator Operator must be able to work outdoors in varying weather conditions and environments, including exposure to dust, noise, and live traffic. This role requires the ability to climb in and out of heavy equipment, sit for extended periods while operating machinery, and perform tasks involving bending, lifting, and carrying tools or attachments up to 50 pounds.
 

Powered by JazzHR

Numbers & Facts

LocationEl Paso, TX
Job TypeFull-time
Websitehttps://www.ellasa.com/

Skills

  • Communication Skillsunmatched
  • Concreteunmatched
  • Constructionunmatched
  • Equipment Maintenance/Repairunmatched
  • Excavationunmatched
  • Excavatorunmatched
  • Fast Foodunmatched
  • Heavy Equipment/Vehiclesunmatched
  • Network Operations Centerunmatched
  • OSHAunmatched
  • Physical Demandsunmatched
  • Safety Processunmatched
  • Safety/Work Safetyunmatched
  • Team Playerunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder