Low Voltage QA/Security Cx Associate (Owners Representative) - Data Center Construction

Kalcon
  • Fayetteville, Georgia
    30+ days ago

    Job Description

    Seeking a Low Voltage QA/Security Cx Associate to provide Owner Representation on the construction of a data center campus.

    Minimum Qualifications:
    - A four-year degree in Construction Management, Electrical Engineering, or a related field is preferred.
    - In lieu of a degree, equivalent field experience in low voltage systems installation and supervision will be considered.
    - Minimum of 4 years of experience in low voltage infrastructure, including cable tray, conduit, and equipment installation.
    - Experience supporting mission critical or high-tech construction projects.
    - Familiarity with security, network/WAP, and controls cabling systems.
    - Experience with commissioning processes, including script assignment and documentation in platforms such as Cx Alloy.
    - Strong understanding of installation quality standards, labeling protocols, and clean workmanship practices.
    - Proficiency in construction management software such as Procore or Autodesk Construction Cloud (ACC).
    - Excellent communication and coordination skills across disciplines and vendors.
    - Ability to manage punch list resolution and ensure timely corrective actions.

    Tasks and Responsibilities:
    Field Oversight & Inspection
    - Conduct field inspections to verify that low voltage systems installation is progressing according to schedule.
    - Assess installation quality to ensure compliance with design documents.
    - Document findings using platforms such as Procore or Autodesk Construction Cloud (ACC) and follow up to
    confirm completion of corrective actions.
    - Collaborate with Q-Systems support to provide onsite oversight, direction, and coordination across disciplines.
    Pathways
    - Oversee installation of Outside Plant (OSP) and Inside Plant (ISP) pathways.
    - Monitor base building low voltage cable tray installation.
    - Inspect conduit rough-in for compliance and readiness.
    - Ensure network rooms are prepared for equipment installation and meet design specifications.
    Low Voltage Cable & Equipment Installation
    Oversee installation of cabling for:
    - Security systems
    - Network and Wireless Access Points (WAP)
    - Controls systems
    Verify installation of equipment per design for:
    - Security systems
    - Network and WAP infrastructure
    - Building Management System (BMS) and Emergency Power Supply (EMPS) controls
    Physical Inspection
    - Confirm proper installation of devices and equipment.
    - Ensure labeling is accurate and workmanship is clean and professional.
    Commissioning (Cx) Support
    - Coordinate and monitor commissioning efforts for security systems.
    - Assign commissioning scripts to equipment within Cx Alloy.
    - Witness commissioning activities and document results in Cx Alloy.
    - Track and follow up on punch list items to ensure resolution and path to completion.
     
    Benefits Offered:
    • Medical insurance
    • Dental insurance
    • Vision insurance
    • Life Insurance 
    • Accident Insurance 
    • Long Term Disability 
    • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
    • 15 days of paid time off
    • 8 paid national holidays
    • Reimbursement for professional licenses and certifications

     

    Submission Requirements:
    At a minimum, the candidate's professional resume must include the following:
    - List of all Educational Achievements
    - List of all Professional Licenses or Certificates
    - List of Awards Received
    - Detailed Employment History with each company:
    o Name of the firm or agency
    o Start Date and End Date (Month & Year)
    o Positions Held

    At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

    Salary Range

    $100,000 - $150,000USD

    Numbers & Facts

    LocationFayetteville, Georgia

    Skills

    • Cloud Computingunmatched
    • Commissioningunmatched
    • Communication Skillsunmatched
    • Constructionunmatched
    • Construction Industry Softwareunmatched
    • Construction Managementunmatched
    • Construction Projectsunmatched
    • Corrective Actionunmatched
    • Design Documentunmatched
    • Documentationunmatched
    • Electrical Engineeringunmatched
    • Insuranceunmatched
    • Internet Service Providersunmatched
    • Low Voltage (LV)unmatched
    • Maintain Complianceunmatched
    • Network Operations Centerunmatched
    • Organizational Skillsunmatched
    • Professional Licenseunmatched
    • Property Managementunmatched
    • Quality Assuranceunmatched
    • Quality Metricsunmatched
    • Reimbursementunmatched
    • Requirements Managementunmatched
    • Scripting (Scripting Languages)unmatched
    • Systems Administration/Managementunmatched
    • Time Managementunmatched
    • WAP (Wireless Application Protocol)unmatched
    • Wireless Communicationsunmatched

    Be found by employers

    5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

    Level up your application

    Professional resume templates

    Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

    Free resume templates

    Resume Builder

    Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

    Resume Builder