Night Shift Field Safety needed - Data Center Construction/Eagle Mountain, UT

Code Red Safety
  • Eagle Mountain, Utah
  • Autofill and Review
18 days ago

Job Description

Code Red Safety is looking for a night shift Field Safety Tech to support a large construction project in Eagle Mountain, UT.  This role will begin as soon as possible working 60-70hours per week (night shift 4p-2:30am).  The contract is expected to run through December.  Local candidates will have first consideration.  Applicants Must meet the following requirements:
  • Must have 3-5 years of field safety experience
  • Must have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar
  • Must have a current FA/CPR
  • Must be able to pass a drug test & background check.
Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction project nationwide on a 1099 independent contract basis.  If you meet the qualifications and are interested, please apply.  If you are determined to be a good candidate for this position, we will be in touch to discuss additional details. 

Numbers & Facts

LocationEagle Mountain, Utah

Skills

  • Background Investigationunmatched
  • CPR Certificationunmatched
  • Constructionunmatched
  • Network Operations Centerunmatched
  • OSHAunmatched

Be found by employers

5,500+ employers search our resume database daily. Add yours to get found by recruiters looking for candidates like you.

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder