We have partnered with a large Civil Engineering company in the Phoenix, AZ area to provide them with a Public Works Flood Control Project Manager. Please review the description below and let us know if you are interested.
Prioritized Must Have Skills for the Public Works Flood Control Project Manager:
#1. Must a PE license in AR
#2. Must have marketing and business development with record of winning projects.
#3. Must have Certified Floodplain Manager (CFM) is required or ability to obtain within six months.
#4. No more than 3 jobs in the last 10years
Responsibilities of the Public Works Flood Control Project Manager:
Will lead and direct the activities necessary to meet client expectations. Prior experience demonstrating people skills, technical skills and management skills are essential to this position. In brief, this position will attend and actively participate in business development, client marketing and project development.
Great opportunity to lead a variety of water resources related projects involving hydrologic and hydraulic modeling and analysis, flood hazard identification/mitigation, Federal Emergency Management Agency (FEMA) studies, Area Drainage Master Studies and Plans (ADMS/P), sediment yield, river mechanics, transportation drainage, and stream stabilization design. Knowledge in the application of FLO-2D is required.
You will mentor staff, review engineering calculations, prepare design reports and exhibits, supervise the planning, development, and oversee the production of construction documents. They will conduct quality control reviews of 1D and 2D computer models, floodplain mapping, watershed planning, stream stabilization, closed conduit systems, hydraulic structures, and open channel designs.
- Client service skills or ability to develop.
- Marketing and business development with record of winning projects.
- Develop scopes, prepare cost proposals, and negotiate contracts.
- Create and manage project budgets, schedules, and resource allocation.
- Experienced in employee supervision, development, and mentoring.
- Apply technical knowledge throughout project duration.
Requirements of the Public Works Flood Control Project Manager:
- BS in Civil Engineering, AZ Professional Engineer's license.
- Certified Floodplain Manager (CFM) is required or ability to obtain within six months.
- Ability to plan, organize, supervise, coordinate technical work and satisfy clients.
- Ability to communicate clearly, including speaking, listening and writing.
- Excellent technical writing, communication, and leadership skills with the ability to develop and maintain strong client relationships.
Other Key Requirements:
Benefits of the Public Works Flood Control Project Manager:
- Health, Dental, Vision
- 401(k) with employer matching
- LTD/STD/Life Insurance
- In-house training events
- Employee Appreciation events