Safety Manager needed - Data Center Construction/Goodyear, AZ

Code Red Safety
  • Goodyear, Arizona
    8 days ago

    Job Description

    Code Red Safety is looking for a Safety Manager with a current BCSP certification for a project in Goodyear, AZ.  Work is already underway and this role will be added to the site ASAP.  The project is anticipated to run for approximately 24 months.  The standard work schedule is 60 hours per week, however there could be additional significant overtime.  

    Applicants MUST meet the following requirements:
    • Have 5-10 years of commercial construction safety experience
    • HAVE one of the following BCSP certifications: CHST, STS-C, ASP or GSP.
    • In addition, must also have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar
    • Data Center construction experience and a current NFPA 70E is a plus
    • Have a current FA/CPR
    • Must be able to pass a drug test & background check. 
    Code Red Safety specializes in placing qualified safety professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis. If you meet the qualifications, and are interested in the position, please apply.  If you are determined to be a good candidate for this project, we will be in touch to discuss additional details. 
     

    Numbers & Facts

    LocationGoodyear, Arizona

    Skills

    • Background Investigationunmatched
    • C Programming Languageunmatched
    • CPR Certificationunmatched
    • Code Redunmatched
    • Constructionunmatched
    • GSP (Good Safety Practices)unmatched
    • Microsoft Active Server Page (ASP)unmatched
    • National Electrical Codeunmatched
    • Network Operations Centerunmatched
    • OSHAunmatched
    • Safety Codesunmatched

    Level up your application

    Professional resume templates

    Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

    Free resume templates

    Resume Builder

    Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

    Resume Builder