FST Technical Services logo

Senior Electrical Commissioning Engineer - Data Center Construction

FST Technical Services
  • Irvine, CA
  • $130,000–$180,000 Per Year
  • Autofill and Review
30+ days ago
FST Technical Services

Job Description

Lead the Systems That Power Critical Infrastructure 

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution. We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments. 

Why This Role Stands Out 

This is not a checklist-driven commissioning role. This is a position for someone who: • Owns outcomes, not just tasks • Understands systems holistically, not in silos • Can operate independently while leading others You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions. 

What You’ll Do 

Project Leadership & Execution • Lead commissioning activities across the full project lifecycle • Execute and oversee functional testing, factory witness testing, and on-site validation • Manage multiple assignments while maintaining schedule, budget, and quality expectations • Interpret contract documents to identify risks and opportunities Technical Expertise & Problem Solving • Evaluate electrical distribution systems and building system interconnectivity • Troubleshoot system performance issues in real time • Review design documentation and submittals Client & Stakeholder Engagement • Lead commissioning meetings and communicate findings • Serve as a trusted partner to clients and contractors Operational Contributions • Complete field reports, documentation, and time management • Support scheduling and revenue targets Team Development • Mentor junior engineers and support training initiatives 

What You Bring 

Core Qualifications • Electrical Engineering degree or Qualified Electrician background • 7+ years in electrical systems OR 3+ years commissioning • Data center or mission-critical experience Technical Capabilities • Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation • Ability to read construction drawings and specifications Professional Skills • Strong analytical and communication skills • Ability to lead meetings and manage multiple priorities Physical Requirements • Ability to work in field environments, climb ladders, and lift ~30 lbs Preferred • EIT, CEM, LEED, OSHA 30, BIM experience 

Travel Requirements 

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required. 

Why FST 

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership rolesSalary range: $130,000 to $180,000

Powered by JazzHR

Numbers & Facts

LocationIrvine, CA
IndustryElectronics, Components, and Semiconductor Mfg
Salary$130,000–$180,000 Per Year
Company Size50 to 99 employees
Year Founded1984
Websitehttp://www.fsttechnical.com

About Company

FST Technical Services was founded in 1984 to serve the needs of the growing, worldwide Semiconductor/Microelectronics and Life Sciences industries. We began as an independent interface between our clients and their subcontractors to establish build clean installation methods that satisfied internal specifications and conformed to regulatory requirements.

FST’s core expertise is in developing technical and logistical solutions for complex needs by continually investing in the most advanced equipment and training to meet the needs of the rapidly changing markets it serves. Today, our business has expanded to additional markets, including Automation, Manufacturing, Data/IT Centers, Energy/Advanced Technology and Technology/Research Laboratories.

Our experienced FST team serves as your trusted partner for QA/QC Services, Equipment Services, Staffing Solutions, Project Management, Analytical Testing and Inspections – virtually anything you might need throughout your project lifecycle. FST professionals also provide project consultation and employee training. We guide our customers throughout each project phase to ensure full compliance.

With peerless performance and proven results, FST is with you all the way.

Skills

  • Analysis Skillsunmatched
  • Automationunmatched
  • Budgetingunmatched
  • Commissioningunmatched
  • Commissioning - Engineeringunmatched
  • Communication Skillsunmatched
  • Constructionunmatched
  • Construction Drawingsunmatched
  • Contract Analysisunmatched
  • Documentationunmatched
  • Electrical Engineeringunmatched
  • Electricityunmatched
  • Fire Alarmunmatched
  • Fire Suppression/Controlunmatched
  • Functional Testingunmatched
  • HVACunmatched
  • Identify Issuesunmatched
  • Leadershipunmatched
  • Lift/Move 30 Poundsunmatched
  • Manufacturingunmatched
  • Mentoringunmatched
  • Multitaskingunmatched
  • Network Operations Centerunmatched
  • OSHAunmatched
  • Physical Demandsunmatched
  • Problem Solving Skillsunmatched
  • Project Commissioningunmatched
  • Project Engineeringunmatched
  • Project Executionunmatched
  • Project Lifecycleunmatched
  • Revenue Planningunmatched
  • Risk Analysisunmatched
  • Team Buildingunmatched
  • Time Managementunmatched
  • Willing to Travelunmatched

Level up your application

Professional resume templates

Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.

Free resume templates

Resume Builder

Improve your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.

Resume Builder