Build the future, spark innovation and align your career with purpose.
McKinstry is innovating the waste and climate harm out of the built environment and creating lasting impact. Together, we're building a thriving planet.
Buildings are a leading contributor to the climate crisis, generating nearly 40% of total global energy-related carbon emissions. We're making a lasting impact on our industry and within our communities by addressing the climate, affordability and equity crises through:
To get where we're going, we need big thinkers, problem solvers and collaborative mindsets. Does that sound like you?
The Opportunity with McKinstry
McKinstry is looking for a Senior Project Engineer - Data Center Construction to join our Data Center Innovations division in Dallas, TX. This role is responsible for overseeing the delivery of complex projects, with responsibility for fiscal outcomes, technical quality, and stakeholder coordination from initiation through closeout. Additional responsibilities may include:
Project Coordination
Documentation
Safety
What You Need To Succeed at McKinstry:
Proficiency in all Construction Project Engineer responsibilities.
BA/BS in Construction Management, Mechanical Engineering, Electrical Engineering, Architecture, Facilities Management, or comparable degree.
2 years of Project Engineer role equivalent required.
Knowledge of construction management, commercial building process, and financial acumen
required.
Experience on large data center projects in preferred.
Professional Engineer (PE) and LEED professional designations preferred.
PeopleFirst Benefits
When it comes to the basics, we have you covered:
People come first at McKinstry, and we go beyond the basic benefits with:
See benefit plan documents for complete details.
If you're driven by our vision to build a thriving planet together, McKinstry is the place to build your career.
The pay range for this position is $36.48 - $61.97 per hour; however, base pay offered may vary depending on job-related knowledge, skills, and experience. This position is considered non-exempt and will be paid hourly. A bonus may be provided as part of the compensation package, in addition to a full range of medical, financial, and/or other benefits, dependent on the position offered. Base pay information is based on market location.
The McKinstry group of companies are equal opportunity employers. We are committed to providing equal employment opportunities to all employees and qualified applicants without regard to sex, gender identity, sexual orientation, age, race, color, creed, marital status, national origin, disability, veteran status, genetic information or any other basis protected by law. This policy applies to all terms and conditions of employment including, but not limited to employment, advancement, assignment, and training. This commitment to Equal Employment Opportunity is made equally as a social responsibility and as an economic and business necessity.
McKinstry is a drug-free workplace. Employment is contingent upon successfully passing a pre-employment drug and alcohol test, complying with the requirements of the Immigration Reform and Control Act and a Confidentiality Agreement, in addition to successful outcomes of background and reference checks.
Applicants for this role will only be considered if they possess current US Work Authorization, and do not require employer-sponsored VISA support to begin or remain in this role.
#LI-SS1
| Location | Dallas, TX |
| Salary | $36.48–$61.97 Per Hour |
Browse dozens of recruiter approved resume templates, layouts and formats. Choose your favorite and make it your own in minutes.
Free resume templatesImprove your existing resume or start from scratch and create a standout, ATS-friendly resume. Add job-specific content, download and apply.
Resume Builder