Demonstrated ability to become a member of the Planning Review Board and be responsible for reviewing and approving fabrication planning as well as providing dispositions for items that are designated as Controlled Items (Fatigue, Primary, Critical, Flight Safety Parts, and Critical Safety Items).Ability to work with various Manufacturing, Procurement, Quality and Design personnel, and support a diverse manufacturing/assembly and/or Flight test environment. Bell is seeking self-motivated Liaison Engineers to join Bell’s FLRAA Program team in Wichita, KS to work closely with all engineering support and design groups, including airframe design, stress, material & processes, fatigue, rotors, drive systems, electrical, and avionics to support the evaluation and disposition of non-conforming products per Material Review Board (MRB) policies and procedures.