Fuels Superintendent GSI Service GroupFuels SuperintendentSan Diego, CaliforniaMINIMUM QUALIFICATIONS, SKILLS, AND EDUCATIONAL REQUIREMENTS A Bachelors Degree from an accredited university in Construction Management, Construction Science, Architecture, or Engineering, with a minimum of three years experience (within the last 10 years) as a Site Superintendent, in construction of the installation of work including petroleum, oil, and lubricants (POL) facilities, tank rehabilitation, tank cleaning and repairs and emergency inspection OR a minimum of eight years construction experience (within the last 10 years) as a Site Superintendent with training in engineering and construction management. This individual will be responsible for directing, managing, supervising and coordinating the work and activities of the various trade groups on the work site to meet requirements as described in the statement of work or contracts.
Project Controls Analyst Ampirical Solutions LLCProject Controls AnalystSan Ramon, CA$76,654–$132,945 / yearJob Summary: The Project Controls Analyst is responsible for performing project controls on assigned projects including; project planning and scheduling, and monitoring, risk management and mitigation, change management, and internal and external reporting. The Project Controls Specialist is responsible for creating and maintaining resource loaded schedules for all transmission and distribution line projects through the use of the scheduling program called Primavera.
General Contractor Expert Pete Fowler Construction ServicesGeneral Contractor ExpertSan Juan Capistrano, CaliforniaThe General Contractor Expert has extensive experience in some aspect of construction or buildings (general contractor, trade contractor, architect, engineer, cost estimator, scheduler, etc.), as well as proven experience serving as the designated expert for lawsuits and/or insurance claims. Document Analysis Review, analyze, summarize, and demonstrate understanding of: Construction documents (proposals, architectural drawings, contracts / subcontracts, schedules, change orders, daily logs, etc.).
Customer Service Manager (Building Materials) All Kingspan and Affiliate CompaniesCustomer Service Manager (Building Materials)Modesto, CaliforniaKingspan Insulated Panels North America, a division of the Kingspan Group plc headquartered in Ireland, is a global and trusted leader in the design, manufacturing, and supply of high-performance sustainable building products and solutions for the construction industry. Through the utilization of experience and effective leadership techniques, the ideal candidate will optimize tools and processes to support the team in delivering results and ultimately raise the level of customer satisfaction through elevated levels of service across the team.
New["General Contractor Expert","General Contractor Expert"] Pete Fowler Construction Services["General Contractor Expert","General Contractor Expert"]San Juan CapistranoThe General Contractor Expert has extensive experience in some aspect of construction or buildings (general contractor, trade contractor, architect, engineer, cost estimator, scheduler, etc.), as well as proven experience serving as the designated expert for lawsuits and/or insurance claims. Document Analysis Review, analyze, summarize, and demonstrate understanding of: Construction documents (proposals, architectural drawings, contracts / subcontracts, schedules, change orders, daily logs, etc.).
Area Schedule Lead, Leased Data Centers Meta Platforms IncArea Schedule Lead, Leased Data CentersMenlo Park, CALead ad-hoc schedule analysis to support program as required Lead a small team of consultants (if required) to support effective schedule management for the designated portfolio of projects Approximately 25-50% travel to other Data Center sites and Meta Offices10+ years of Planning, Scheduling, Construction Management, or Related field experience Bachelor's degree in Engineering, Construction Management, or Equivalent Technical Field or related field experience Subject Matter Expert in Primavera P6 and/or other scheduling related methodologies and software Experience developing/managing an Owner's planning/scheduling program Experience with Data Center, Infrastructure or Construction programs requiring complicated commissioning specifications Demonstrated analytical, communication, problem solving, prioritization, organization and reporting skills Experience leading complex project or program planning and coordination amongst a large group of internal and external project stakeholders Experience developing and driving actions or operational adjustments based on schedule or project controls performance metrics Experience partnering with cross-functional teams to influence strategic direction Experience identifying schedule efficiencies and driving programmatic or organizational alignment in changing execution strategies to optimize schedule performance Experience negotiating schedule changes or complex construction claims Successful development and implementation of scheduling or project controls strategies in a large organization Familiar with complex networking systems and electrical infrastructure Experience managing a team of Contingent Worker Schedulers Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements) Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews) Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologiesMeta builds technologies that help people connect, find communities, and grow businesses. Responsible for end to end schedule coordination and updates, including interface with risk management and pro-active communication of updates and alignment of variance root cause/commentary with Cross-functional partners Identifies, documents, and communicates schedule risks through defined processes, including Risk Registers, health reviews, and Leased Program management meetings Accountable for all aspects of vendor and Contractor schedule management Accountable for Contractor baseline schedule development and evaluation during pre-con, including ensuring adherence to program guidance and specifications.
BUILDING MATERIALS CUSTOMER SERVICE MANAGER Kingspan Group PlcBUILDING MATERIALS CUSTOMER SERVICE MANAGERModesto, CAKingspan Insulated Panels North America, a division of the Kingspan Group plc headquartered in Ireland, is a global and trusted leader in the design, manufacturing, and supply of high-performance sustainable building products and solutions for the construction industry. Through the utilization of experience and effective leadership techniques, the ideal candidate will optimize tools and processes to support the team in delivering results and ultimately raise the level of customer satisfaction through elevated levels of service across the team.
Sr. Program Manager - Utilites & Infrastructure Turner & Townsend LtdSr. Program Manager - Utilites & InfrastructureCARisk and opportunity management - Responsible for monitoring connected projects risks and opportunities and assessment of their cost and schedule impact is being undertaken by the execution teams align with the identification and implementation of connect projects mitigation plans identified for critical risks and opportunities. Procurement Management - Responsible for defining the procurement approach that is objectively managed and leverages data as part of pre-qualification, tender and evaluation through to contract award and assures the delivery of required outcomes are undertaken by the execution teams.
Electrical Resident Engineer AECOMElectrical Resident EngineerOrange, CAWe invite you to bring your bold ideas and big dreams and become part of a global team of over 50,000 planners, designers, engineers, scientists, digital innovators, program and construction managers and other professionals delivering projects that create a positive and tangible impact around the world. Our teams partner with public- and private-sector clients to create innovative, sustainable and resilient solutions throughout the project lifecycle - from advisory, planning, design and engineering to program and construction management.
["General Contractor Expert","General Contractor Expert"] Pete Fowler Construction Service["General Contractor Expert","General Contractor Expert"]San Juan CapistranoThe General Contractor Expert has extensive experience in some aspect of construction or buildings (general contractor, trade contractor, architect, engineer, cost estimator, scheduler,etc.), as well as proven experience serving as the designated expert for lawsuits and/or insurance claims. Document Analysis Review, analyze, summarize, and demonstrate understanding of: Construction documents (proposals, architectural drawings, contracts / subcontracts, schedules, change orders, daily logs, etc.).
Senior Project Manager, Capital Projects Sila NanotechnologiesSenior Project Manager, Capital ProjectsAlameda, CA$160,000–$210,000 / yearYou will serve as a key leader, directly and indirectly supervising specific project team roles-such as Project Engineers, Construction Managers, and Project Coordinators-while collaborating with internal teams and external engineering and construction partners to effectively coordinate, execute, and close out this large-scale capital project. Project Leadership: Direct and lead key phases of large capital projects and construction management including: project planning, site development, permitting, contracts, front-end engineering and detailed design (FEED), documentation, construction, and closeout.
Site Administrator Anaergia Inc.Site AdministratorSantee, CAPreferred: A Bachelor's Degree in Business Administration or related field, and at least two (2) years in construction site administration, project site administration, industrial office management, and/or construction/project accounting (waste treatment, construction, industrial manufacturing, or similar industrial environments). Through a proven portfolio of proprietary technological solutions, Anaergia maximizes the generation of renewable energy, diversion of waste from landfill, and reduction of greenhouse gases for customers across the municipal, industrial, commercial, and agricultural sectors.
7262-Maintenance Planner-Facilities-SFO (TPV-7262-165097) City and County of San Francisco7262-Maintenance Planner-Facilities-SFO (TPV-7262-165097)San Francisco, CACompensation Range: $169,130 yearly; $81.3125 hourlyRecruitment ID: TPV-7262-165097; RTF0165096-01120244Working at SFO:San Francisco International Airport (SFO) is one of the most dynamic and consequential airports in the world, serving as the primary international gateway to Northern California and Silicon Valley. Three (3) years of verifiable experience in one of the following areas:a) as a maintenance estimator and/or scheduler or equivalent in facilities (building utilities, related structures and equipment) maintenance;b) as a maintenance planner for construction or facilities/equipment maintenance;c) as a supervisor of journey level workers in a construction or facilities/equipment maintenance related field;OR2.
NewInfrastructure & Capital Projects – Senior Program Manager, ANS Accenture Infrastructure and Capital ProjectsInfrastructure & Capital Projects – Senior Program Manager, ANSMoreno Valley, California$175,000–$208,000 / yearVisit us here to learn more about Accenture Infrastructure & Capital Projects As Accenture continues to grow, you may see a variety of new career opportunities, and depending on the role and location you may be directed to apply through Accenture Infrastructure and Capital Projects LLP or one of our other legal entities - Accenture Infrastructure and Capital Projects, LLC or Accenture Infrastructure and Capital Projects Inc., with benefits varying by country and role, so please check with your recruiter for details. As required by local law, Accenture provides a reasonable range of compensation for roles that may be hired in Illinois, Maine, Minnesota, California, Colorado, District of Columbia, Maryland, Massachusetts, New York, New Jersey, Ohio, Virginia or Washington as set forth below.
NewProject Specialist Stanford UniversityProject SpecialistStanford, CADepartment/Program Description: Facilities Planning and Safety (FPS) supports teaching, research and creative expression within the School of Humanities and Sciences by fostering safe environments through thoughtful planning and management of facility projects and space utilization. The ideal candidate will have a demonstrated track record of successfully managing projects valued between $10,000 and $100,000 from initiation through completion while consistently meeting budget, schedule, scope, and end-user requirements.
Project Engineer Stanford UniversityProject EngineerStanford, CA$100,000–$108,000 / yearR&DE is a talented and diverse team of 1,200+ who comprise the following divisions: Student Housing Operations & Stanford Conferences; Stanford Dining and Hospitality & Auxiliaries; Maintenance Operations and Capital Projects; and a team of R&DE strategic business partners-Finance & Administration, Information Technology, Human Resources, and Strategic Communications and Marketing. With world-class scholars and seven schools located together on a single campus, Stanford offers academic excellence across the broadest array of disciplines including business, education, engineering, humanities and sciences, law, medicine, and sustainability.
Theatre Production Coordinator - Substitute (Hourly as Needed) Rio Hondo Community CollegeTheatre Production Coordinator - Substitute (Hourly as Needed)Whittier, CAMENTAL DEMANDS: While performing the duties of this class, incumbents are regularly required to use written and oral communication skills; read and interpret data; use math and mathematical reasoning; analyze and solve problems; learn and apply new information and skills; perform highly detailed work on multiple, concurrent tasks; and interact with District, students, vendors and others encountered in the course of work, some of whom are dissatisfied or abusive. Río Hondo College offers 30 associate degrees that guarantee transfer (ADTs) to Cal State Universities, a bachelor's degree in Automotive Technology, more than 60 certificates, a Pathway to Law School, dual enrollment with K-12 districts, state championship speech & debate team, top-notch athletic teams, student leadership opportunities, travel abroad experiences and more.
Theater Production Coordinator Rio Hondo Community CollegeTheater Production CoordinatorWhittier, CA$6,359.63–$8,137.41MENTAL DEMANDS: While performing the duties of this class, incumbents are regularly required to use written and oral communication skills; read and interpret data; use math and mathematical reasoning; analyze and solve problems; learn and apply new information and skills; perform highly detailed work on multiple, concurrent tasks; and interact with District, students, vendors and others encountered in the course of work, some of whom are dissatisfied or abusive. Río Hondo College offers 30 associate degrees that guarantee transfer (ADTs) to Cal State Universities, a bachelor's degree in Automotive Technology, more than 60 certificates, a Pathway to Law School, dual enrollment with K-12 districts, state championship speech & debate team, top-notch athletic teams, student leadership opportunities, travel abroad experiences and more.
NorCal-Pinnacle - Field Engineer 1 Kiewit CorpNorCal-Pinnacle - Field Engineer 1Wasco, CA$86,000–$96,000 / yearWe offer our fulltime staff employees a comprehensive benefits package that's among the best in our industry, including top-tier medical, dental and vision plans covering eligible employees and dependents, voluntary wellness and employee assistance programs, life insurance, disability, retirement plans with matching, and generous paid time off. Whether we're upgrading waste water treatment plants, tunneling through mountains, increasing the capacity of reservoirs, or building bridges that connect communities, we depend on our passionate, skilled, and safety-driven construction professionals to get it done right.
Superintendent - Transportation/Infrastructure Kiewit CorpSuperintendent - Transportation/InfrastructureVentura, CA$125,000–$135,000 / yearWe offer our fulltime staff employees a comprehensive benefits package that's among the best in our industry, including top-tier medical, dental and vision plans covering eligible employees and dependents, voluntary wellness and employee assistance programs, life insurance, disability, retirement plans with matching, and generous paid time off. Kiewit's Southern California District is one of Kiewit's leading infrastructure districts specializing in heavy civil projects that include earth moving, water/wastewater, transportation, roadways, and power projects.