p>Responsibilities: • Developing, maintaining and driving engineering and construction schedules for various sized transmission & distribution projects for public-owned and investor-owned electric utilities located throughout the United States • Work with Project Management using earned value management techniques to ensure that schedule and costs are aligned, including the development of recovery plans, to stay within approved limits • Partner closely with Engineering Leads and Managers to track and execute client deliverables • Develop and produce schedule weekly/monthly project control reports for client and internal management review: which includes resource loading analysis and schedules, critical path items and risk analysis • Interfacing directly with the client and internal management to report progress, schedule and risks across a portfolio of electrical distribution projects • Assist the project manager with the creation and maintenance of comprehensive project dashboard reports and KPI tracking.
Background Requirements/Qualifications:
• Bachelors degree in the following disciplines: Engineering, Construction Management, Business or Finance required • Minimum of three (3) + years of relevant Primavera P6 scheduling experience • Should demonstrate recent and in-depth knowledge of electric power infrastructure projects within transmission or distribution design • Must have the capability for planning, organizing, directing and tracking technical efforts on assigned tasks • Must be capable of tracking cost and schedule status of assigned tasks • Must be able to interact with customer representatives in an effective manner • Strong writing and verbal communication skills • Proficiency utilizing MS Project and MS Office suite with a heavy emphasis on MS Excel.